1. Electrostatic immunity
Ideally , Our system is a hollow and airtight metal box , According to the theory of electromagnetic field , No external static power source can affect the circuit operation inside the box . However, such a system has no practical significance . An actual system must include external interfaces ( It is impossible to seal ). A practical ( Metal shell ) The system should be able to ( Before accumulating electrostatic charges sufficient to affect the operation of the system ) Discharge the static electricity applied on it to the ground quickly enough . This brings the following requirements ( Only for metal clad equipment ):
1) Good grounding terminal
2) Any bare 、 All metals that may be affected by static electricity should be well connected with the grounding terminal
3) Any gap in the equipment shell should be small enough , So that static electricity cannot pass through the metal gap “ through ” To the inside of the equipment
2. Chassis overview

This case has an upper cover , The upper cover is larger than the chassis ( It's big !) Area of metal contact , Unfortunately, I forgot to take pictures . In the impression, the upper cover covers the left side of the chassis as a whole 、 On 、 Right 、 The last four sides .
3. Power input and AC/DC

The ground wire of the power input is directly connected to the chassis shell , And didn't receive AC/DC On , That is to say , Take this large piece of metal as a perfect electrostatic discharge circuit ( It should also be good for tests such as surge ).AC/DC The blue device above the power input socket should be a varistor ?
4. AC/DC Output
AC/DC The output is directly connected to the motherboard (PCB Power input and working place ).
5. Connection between motherboard and chassis

You can see , There is a large area of exposed copper foil under the screw used to fix the motherboard . Disassemble the motherboard , The chassis shell below is like this :

Each mounting hole is bulged with a large area . Corresponding , From the bottom of the chassis , The mounting hole is sunken .
Each fixed PCB The screws will PCB Somewhere on the ( Working place or connector place , See below ) Connect to the chassis shell .PCB The working ground and connector ground on the are grounded together through the chassis shell .
6. Motherboard connector and chassis 、 Connection between mainboards
There are two situations .
6.1 The connector welded on the motherboard is well overlapped with the chassis shell

In the figure, the chassis shell has a corner at the connector hole , It is well connected with the spring of the connector . At this time, connect the connector housing directly to PCB Where I work .
6.2 The contact between the connector shell and the chassis is not good enough
At this time, the connector shell is PCB Use a separate ground plane on ( Several connector housings that have poor contact with the chassis shell share the ground plane ), Then on the one hand PCB Jumper capacitance between upper and working ground , On the other hand, it is connected to the chassis shell through the screws and large-area copper foil mentioned above .PCB The ground and working ground of the connector on the chassis are grounded together . stay PCB The two are not directly connected ( There is a capacitive connection between the two ). such , When electrostatic discharge is carried out on such connectors , Static electricity will first be discharged through the chassis shell , Instead of running to PCB On the working floor .

7. Miscellaneous
7.1 Tap the switch
( Touch switch operated by panel ) The grounding foot of the is connected to the connector ground , Therefore, without installing into the chassis , Touching the switch will not work .
7.2 Network interface protection
In addition to the commonly used local side TVS Outside , The ground on the transformer side passes through the varistor ( Unknown resistance value ) Connect to the connector ground ( Finally, it is connected to the workplace through the chassis ).
The network indicator is placed in PCB On , Lead out through the long light guide column , Instead of using belts LED Of RJ45 seat , Avoid static electricity LED Signal line interferes with system operation .
From the blog Garden to bid farewell to the era 《EMC start : Huawei switch dismantling 》
边栏推荐
- 教程篇(7.0) 06. 零信任网络访问ZTNA * FortiClient EMS * Fortinet 网络安全专家 NSE 5
- Student duty problems
- [untitled]
- 牛客Mysql——SQL必知必会
- Why is ESD protection so important for integrated circuits? How to protect?
- Deployment of elk log analysis system
- Shortest seek time first (SSTF)
- uniapp项目怎么连接手机真机调试
- Eventbus of guava
- guava之guava cache
猜你喜欢
随机推荐
Summary of project experience
两个链表的第一个公共节点——每日两题
Pytorch - storage and loading model
和为s的两个数字——每日两题
两个星期学会软件测试?我震惊了!
object detection
“核弹级” Log4j 漏洞仍普遍存在,并造成持续影响
EMC之PCB设计技巧
MHA高可用配置及故障切换
Eslint FAQ solutions collection
Basic usage and precautions of arrow function (= >) and three-point operator (...) in ES6 (this points to)
Log in to heroku and the solution of IP address mismatch appears
After learning the four redis cluster solutions at one go, each has its own merits
Use of C3d
nodejs操作MongoDB
Guava cache of guava
牛客Mysql——SQL必知必会
guava之Retryer
Qucs preliminary use guide (not Multism)
Shortest seek time first (SSTF)