Question type
Fill in the blanks 、 choice 、 Judge 、 Short answer 、 application 、 analysis
Fill in the blanks
1. Software crisis refers to the Development and maintenance A series of serious problems encountered in the process
2. The system implementation includes Coding and testing
3. The four elements of a data dictionary : Data flow 、 data elements 、 data storage 、 Handle
4. The most extensive software engineering methodology is Traditional methodology and Object oriented methodology
5. Software maintenance is after the software has been delivered , in order to Correct mistakes or meet new needs And the process of modifying software
choice
1. What are the maintenance activities
2. Decision table
3. The four types of maintenance activities account for the most
4. Three control structures
5. Structured programs mainly emphasize
6. What are the white box tests
7. What are the black box tests
8. The highest degree of coupling is
Judge
1. Spiral model is a combination of waterfall model and incremental model
2. The project has been delayed , Add more people at this time , The progress of the project will be slower
3. The purpose of software maintenance has nothing to do with software quality
4. The stages of waterfall model are sequential and dependent
5. The data flow diagram only describes the logical process of data flow and processing in the software
6.Alpha Testing and Beta Test differences ,Alpha The test is conducted at the developer's site ,Beta The test is carried out at the customer's site
7. Function cohesion has the highest degree of cohesion , best
8. Successful software testing does not prove that the program is error free , You can't find all the mistakes , But you can find the undetected errors
Short answer
1. The difference between boundary value analysis and equivalence partition in black box testing
2. The life cycle of software
application
1. Flow chart modification PAD chart
2. Change the flow chart to the procedure chart , And use three methods to calculate the complexity
analysis
Give a flow chart , And some data
It is required to select the least test data to meet the three tests
( The statement coverage of white box testing in software testing 、 Conditional coverage 、 Conditional combination covering )
边栏推荐
- Edge Drawing: A combined real-time edge and segment detector 翻译
- Md5sum operation
- IEDA 右键源码文件菜单简介
- 咱就是说 随便整几千个表情包为我所用一下
- Install vcenter6.7 [vcsa6.7 (vCenter server appliance 6.7)]
- 文件上传下载
- 打包iso文件的话,怎样使用hybrid格式输出?isohybrid:command not found
- Common interview questions for performance test
- Detailed list of errors related to twincat3 ads of Beifu
- 最新接口自动化面试题
猜你喜欢
随机推荐
Overview of EtherCAT principle
Elk elegant management server log
The shell script uses two bars to receive external parameters
Nacos
不用加减乘除实现加法
Basic concepts of database
So easy deploy program to server
JS daily development tips (continuous update)
打包iso文件的话,怎样使用hybrid格式输出?isohybrid:command not found
Redis 教程
Cookie&Session
第03章_用戶與權限管理
过滤器 Filter
Design of serial port receiving data scheme
Ctfshow blasting WP
Basic concept and classification of sorting
Druid监控统计数据源
Best used trust automation script (shell)
Include() of array
JS日常开发小技巧(持续更新)