当前位置:网站首页>SAP mts/ato/mto/eto topic 9: front and back desk operation in m+m mode, strategy 50, preparation of raw materials and semi-finished products in advance
SAP mts/ato/mto/eto topic 9: front and back desk operation in m+m mode, strategy 50, preparation of raw materials and semi-finished products in advance
2022-06-28 15:10:00 【Layman sees SAP】
SAP MTO Of M+M Pattern
- 1 Background special configuration
- 1.1 Policy group configuration
- 1.2 Create a new sales order type 、 Billing type
- 1.2.1 Sales organization OVX5
- 1.2.2 Expand customers XD01, The current extension is 10000001 and 10000008 Two customers
- 1.2.3 Determine the sales account VKOA
- 1.2.4 Create a sales order type and assign it to the company code
- 1.2.5 Create order line item type
- 1.2.6 The order to line type is determined
- 1.2.7 Define delivery type
- 1.2.8 Delivery item category
- 1.2.9 The delivery line category is determined
- 1.2.10 Define Invoicing type
- 2. Basic preparation
- 2.1 Construction materials 、BOM、 Work center 、 Process route, etc
- 2.1.1 The new company maintains the company code of material management
- 2.1.1 Construction materials MM01, The specified policy group is 50
- 2.1.2 build BOM CS01
- 2.1.3 Build profit center and cost center
- 2.1.3 Assign activity to cost center , Maintenance price
- 2.1.4 OKEW Allocate the split structure to the assembly and manufacturing department of the direct cost center
- 2.1.3 Build a work center CR01
- 2.1.4 Build a process route CA01
- 2.2 Product cost estimation and evaluation
- 2.3 Sales processing
- 3 Business processing
- 3.1 Make sales forecast for finished products MD61
- 3.2 MD41 run MRP, Generate planned orders , However, the planned order cannot be transferred to the manufacturing order
- 3.3 Build sales order , Plan independent requirements will be offset
- 3.4 Run again MRP MD41
- 3.5 Release production order , Execute production
- 3.6 Raw material planned orders are transferred to purchase requisitions and orders
- 3.7 Receiving goods
- 3.8 Shipment to sales order for production
- 3.9 View inventory
- 3.10 Subsequent sales shipments can be performed 、 Production order settlement and material ledger operation .
Today we will focus on simulation MTO Medium M+M Pattern , With configurable materials , It's standard 50 Strategy , The main features of this strategy are as follows :
Expand the lower level requirements according to independent requirements , However, the finished product plan cannot be converted into a work order , When the sales order comes in , The number of independent demands consumed by the sales order , And generate a planned order that can be transferred to a work order , The planned order quantity is equal to the sales order quantity , At the same time, compare the quantity of independent demand with that of sales order , The big one is expanded according to that . And if the parameters of the raw materials on display are concentrated / Independent (mrp4) Set to 1. Production orders , Only for regular customers , If you want to give it to another customer , The inventory needs to be transferred to the sales order inventory of another customer .
It is generally used for final assembly with high added value , Semi finished products or raw materials can be purchased or produced according to independent needs , When the order comes in , Perform final assembly .
1 Background special configuration
1.1 Policy group configuration
1.1.1 Demand class

1.1.2 Type of demand

1.1.3 Production strategy

1.1.4 Strategy Group

1.2 Create a new sales order type 、 Billing type
MTO Of M+M Pattern , Except that the sales order triggers the demand , Others follow MTS almost
1.2.1 Sales organization OVX5
1.2.2 Expand customers XD01, The current extension is 10000001 and 10000008 Two customers
1.2.3 Determine the sales account VKOA
1.2.4 Create a sales order type and assign it to the company code


1.2.5 Create order line item type

1.2.6 The order to line type is determined

1.2.7 Define delivery type

1.2.8 Delivery item category

1.2.9 The delivery line category is determined

1.2.10 Define Invoicing type

2. Basic preparation
This simulation is the whole computer , But not to deliver the whole computer to the customer , It is delivered by parts .
BOM The computer contains a host 、 There are two kinds of semi-finished products for display , And the mouse 、 Keyboard raw materials . One of the hosts 、 Monitor 、 mouse 、 The keyboard is sent to the customer through project delivery .
At the same time, milestone billing , Invoicing by stages according to the billing plan
2.1 Construction materials 、BOM、 Work center 、 Process route, etc
2.1.1 The new company maintains the company code of material management

2.1.1 Construction materials MM01, The specified policy group is 50

Finished product material selection strategy 
2.1.2 build BOM CS01

2.1.3 Build profit center and cost center


2.1.3 Assign activity to cost center , Maintenance price

2.1.4 OKEW Allocate the split structure to the assembly and manufacturing department of the direct cost center

2.1.3 Build a work center CR01

2.1.4 Build a process route CA01

2.2 Product cost estimation and evaluation
2.2.1 CK11N Evaluate the price

2.2.2 CK24 Mark and publish material prices
After the tag

2.3 Sales processing
2.3.1 Expand customers XD01

2.3.2 Shipment point configuration OVL2

2.3.3 Configure automatic posting of sales organization VKOA


3 Business processing
3.1 Make sales forecast for finished products MD61


3.2 MD41 run MRP, Generate planned orders , However, the planned order cannot be transferred to the manufacturing order


3.3 Build sales order , Plan independent requirements will be offset



3.4 Run again MRP MD41

Planned order in SO I have , It can also be transferred to production order


3.5 Release production order , Execute production

3.6 Raw material planned orders are transferred to purchase requisitions and orders


3.7 Receiving goods

3.8 Shipment to sales order for production



3.9 View inventory


3.10 Subsequent sales shipments can be performed 、 Production order settlement and material ledger operation .
边栏推荐
- Express模板引擎
- Send2vec tutorial
- 新零售线下店逆势起飞,通膨乌云下的消费热情
- With 120billion yuan, she will ring the bell for IPO again
- Seata数据库中出现以下问题要怎么解决呀?
- 请问一下,是不是insert all这种oracle的批量新增没拦截?
- R语言ggplot2可视化:使用patchwork包(直接使用加号+)将两个ggplot2可视化结果横向组合起来形成单个可视化结果图
- 代码片段
- Classmate Zhang hasn't learned to be an anchor yet
- Power battery is divided up like this
猜你喜欢

老板囑咐了三遍:低調、低調、低調

MIPS汇编语言学习-01-两数求和以及环境配置、如何运行

vscode编写markdown文件并生成pdf

dolphinscheduler2. Installation of X (valid for personal test)

【黑马早报】腾讯回应大批用户QQ号被盗;薇娅丈夫公司被罚19万;中国恒大被申请清盘;关晓彤奶茶店回应被加盟商起诉...

Halcon basic summary (I) cutting pictures and rotating images

WPF 视频硬解码渲染播放(无空域)(支持4K、8K、高帧率视频)

PMP真的有用吗?

3. Caller 服务调用 - dapr

Power battery is divided up like this
随机推荐
SAP MTS/ATO/MTO/ETO专题之九:M+M模式前后台操作,策略用50,提前准备原材料和半成品
WSUS客户端访问服务端异常报错-0x8024401f「建议收藏」
第四大运营商,难成「鲶鱼」
Send2vec tutorial
[JS] Fibonacci sequence implementation (recursion and loop)
[C language] how to implement plural types
老板囑咐了三遍:低調、低調、低調
Halcon basic summary (I) cutting pictures and rotating images
使用LamdbaUpdateWrapper的setSql作用及风险
当下不做元宇宙,就像20年前没买房!
Functools: high order functions and operations on callable objects (continuous updating ing...)
币圈大地震:去年赚100万,今年亏500万
R语言ggplot2可视化:使用patchwork包将3个ggplot2可视化结果自定义组合起来构成组合图、两个子图横向组合后和另外一个图纵向组合构成最终组合图
The hidden crisis of Weilai: past, present and future
spacy教程(持续更新ing...)
WPF 视频硬解码渲染播放(无空域)(支持4K、8K、高帧率视频)
MIPS汇编语言学习-02-逻辑判断-前台输入
Summary of technical difficulties of wearable neural signal and behavior data detection and recording system for birds in flight
Leetcode (167) -- sum of two numbers II - input ordered array
PMP认证证书的续证费用是多少?