Review summary of engineering surveying examination
2022-07-27 09:46:00 【Kyle942】
1、 Engineering survey is designed according to the planning of engineering construction 、 The three stages of construction and operation management are divided into engineering survey 、 Construction survey and safety monitoring . Engineering construction can be divided into : Site Selection 、 Preliminary design 、 Three stages of construction design . 2、 In the construction design stage of the project construction, the details of each building need to be designed in detail , Topographic map with larger scale is required , Generally, the scale is 1﹕500 to 1﹕2000 The topographic map of .
3、 The mapping methods of large-scale topographic map include analog method and digital method .
4、 The accuracy of large-scale topographic map can be analyzed from two aspects: plane position accuracy and elevation accuracy .
5、 Generally, the scale is 1:1000 The topographic map of is called “ General topographic map ”.
6、 The survey work in the survey and design stage includes preliminary survey 、 Preliminary survey and location survey .
7、 The ultimate purpose of the preliminary survey of the railway is to map the strip topographic map .
8、 Preliminary survey is the survey work in the preliminary design stage , Its field work includes big flag 、 Control measurement 、 Leveling and topographic survey .
9、 The ultimate goal of railway location survey is : Set the selected route on the ground . 10、 Location survey includes center line survey 、 Curve setting 、 Vertical and horizontal section measurement, etc , And collect data for construction design .
11、 The leveling in the preliminary survey stage of the railway is divided into Base level measurement Leveling survey .
12、 The route location survey method includes threading and setting out 、 Angle setting out method 、RTK Method and total station polar coordinate method . 13、 The elevation of underwater point in underwater topographic survey is obtained by subtracting water depth from water level .
14、 There are two commonly used measurement methods in underwater topographic survey: sounding line method and scattered point method . The layout of survey lines mainly considers the spacing and direction of survey lines .
15、 When surveying underwater terrain for port channel , The direction of the main sounding line should be perpendicular to the direction of the isobath .
16、 The main difference between underwater topographic survey and ordinary land topographic survey is that underwater topographic survey must carry out water level measurement and water depth measurement .
17、 The key of underground pipeline exploration is to determine the plane position and buried depth of the pipeline . Underground pipeline detection methods include : Electromagnetic method 、 Magnetic method 、 Seismic wave method 、 Direct current method 、 Infrared radiation method .
18、 At present, the main methods of building measurement are : whole
Station data acquisition method 、 There are three methods of close range photogrammetry and three-dimensional laser scanning measurement .
19、 There are three kinds of conductors in tunnel construction : Construction conductor 、 Basic conductor 、 Main conductor
20、 New deformation observation technology : Global positioning system 、 Synthetic aperture radar interferometry 、 Close range photogrammetry 、 Laser scanning technology
21、4 A basic control network : Engineering control network 、 Mapping control network 、 Construction control network 、 Deformation monitoring control network
22、 Network type of construction horizontal control network : Traverse network 、 Corner net 、GPS network
23、 Bridge control network : Primary control network 、 Encrypt the control network 24、 Tunnel construction control network : Tunnel ground control network 、 Control network in tunnel
25、 Water control network : Plane construction control network 、 Elevation construction control network 26、DTM The establishment process includes : Data collection ( sampling )、 Data processing ( Insert ) Etc .
27、 The main task of the construction control network is to set out the axis of the building .
28、 Of plant control network There are usually two ways to establish : Baseline method 、 Axis method .
29、 The rectangular coordinate method is especially suitable for setting out buildings close to the rectangular control network and convenient for distance measurement . 30、 The lofting data in polar coordinate lofting includes distance and angle .
31、 Curves are divided into plane curves 、 Vertical curve 、 Interchange curve and other types . The plane curve is divided into : Circular curve 、 transition curve 、 Back curve 、 Helix, etc . 32、 The measurement method of curve includes deflection angle method 、 Tangent offset method 、 Polar coordinate method .
33、 The measurement of circular curve is usually carried out in two steps . First, carry out the measurement and setting of main points , Then carry out detailed curve measurement .
34、 The essence of measuring curve details with deflection method is the intersection of direction and fixed length .
35、 The main methods of vertical curve surveying are leveling 、 Trigonometric leveling .
36、 Building deformation is mainly caused by two reasons , First, natural conditions and their changes , The second reason is the connection with the building itself .
37、 In settlement observation , There are three types of points deployed : Datum point 、 Working point and observation point . 38、 The frequency of deformation observation should reflect the process of change , And we can't miss the moment of change .
39、 Static deformation is a function of time , Dynamic deformation is a function of external force .
40、 To ensure the stability of deformation observation benchmark , We can take : Deep burial method or method far away from the construction affected area .
边栏推荐
- 通俗易懂!图解Go协程原理及实战
- 交换机端口镜像配置指南
- Google Earth Engine APP——利用S2影像进行最大值影像合成分析
- Voice live broadcast system - Principles to be followed in developing push notifications
- 走向人生巅峰....
- 如何在树莓派上安装cpolar内网穿透
- c'mon! Please don't ask me about ribbon's architecture principle during the interview
- 吃透Chisel语言.22.Chisel时序电路(二)——Chisel计数器(Counter)详解:计数器、定时器和脉宽调制
- July training (day 20) - binary search tree
- July training (day 17) - breadth first search
猜你喜欢

Nacos配置中心动态刷新数据源

聊聊索引失效的10种场景,太坑了

如何使用TDengine Sink Connector?

ESP8266-Arduino编程实例-中断

Understand chisel language. 24. Chisel sequential circuit (IV) -- detailed explanation of chisel memory

Expose a technology boss from a poor family

Proposed relocation! 211 the new campus of China University of Petroleum (East China) is officially opened!

Nine ways to read the file path under the resources directory

省应急管理厅:广州可争取推广幼儿应急安全宣教经验

Redis 为什么这么快?Redis 的线程模型与 Redis 多线程
随机推荐
How to use tdengine sink connector?
七月集训(第18天) —— 树
聊聊索引失效的10种场景,太坑了
C# 给Word每一页设置不同文字水印
交换机端口镜像配置指南
Expose a technology boss from a poor family
七月集训(第16天) —— 队列
Towards the peak of life
[Wuhan University of technology] information sharing for the preliminary and second examinations of postgraduate entrance examination
July training (day 19) - binary tree
swagger-editor
抢了个票,还以为发现了12306的系统BUG
July training (day 07) - hash table
2016展望
吃透Chisel语言.23.Chisel时序电路(三)——Chisel移位寄存器(Shift Register)详解
七月集训(第13天) —— 双向链表
Quick apply custom progress bar
吃透Chisel语言.25.Chisel进阶之输入信号处理(一)——异步输入与去抖动
走向人生巅峰....
七月集訓(第07天) —— 哈希表