当前位置:网站首页>Military product development process - transition phase
Military product development process - transition phase
2022-07-29 03:16:00 【AbelZ_ 01】
The development process of the approved conventional equipment is generally divided into five stages :
Demonstration stage (L)、 The programme phase (F)、 Engineering development stage (G)、 Design finalization stage (D) And production finalization stage (P), Among them, the engineering development stage is the core stage of the whole development work . It is usually divided into the first sample of the project (C) Just like the project (S) Two sub stages .
1、 General principles for the transition of development work
The basic principle of transferring equipment development to the next stage is to complete the development work specified in this stage before transferring to the next stage One stage development , The development work at this stage has not been completed , We can't cross the development stage and carry out the work of the next stage .
According to the model development contract and general development requirements , Before carrying out the development work of each stage, we should first formulate the development task statement and detailed work plan of this development stage , Organize and carry out various research and development work according to the research and development task , After the development work , Compile and sort out the summary of development work and other design data specified in the standardization according to the standardization regulations 、 Pattern, etc .
The model development unit negotiates with the on-site military representative , Confirm that the development work at this stage has been completed , Both sides of the military factory shall conduct internal transition review first , Then apply to the superior competent department , The superior competent department shall organize experts from all parties to hold a formal transition review meeting .
In the transition review , Experts attending the meeting may raise some problems that remain to be solved , Relevant research and development units must solve these problems within the time limit specified by the meeting , The quality assurance department of the development unit and the on-site military representative shall follow up and inspect , When all the problems are solved , Both sides of the military factory jointly ask for instructions from the competent development department and the user department , After approval, the development work can be transferred to the next stage .
2、 Timing of transition Review
F turn C Stage
As a general rule , The demonstration stage and the scheme stage do not need to go through the transition Review , according to 《 Development procedure of conventional weapons and equipment 》, After the approval of the general requirements for the development of type weapon systems , That is to say L turn F Stage time . The designer shall complete the scheme stage
边栏推荐
- Typescript学习(一)
- "PHP Basics" output approximate value of PI
- Sanzi chess (player + computer)
- makefile详解
- Unity game special effects
- Verilog: blocking assignment and non blocking assignment
- C traps and defects Chapter 3 semantic "traps" 3.3 array declaration as parameters
- Shardingsphere's level table practice (III)
- C陷阱与缺陷 第2章 语法“陷阱” 2.6 “悬挂”else引发的问题
- 12_ UE4 advanced_ Change a more beautiful character model
猜你喜欢
![[robot learning] matlab kinematics and ADMAS dynamics analysis of manipulator gripper](/img/e1/a67048ea69bfe6064651d459311a88.png)
[robot learning] matlab kinematics and ADMAS dynamics analysis of manipulator gripper

从零开始实现lmax-Disruptor队列(六)Disruptor 解决伪共享、消费者优雅停止实现原理解析

Watermelon book learning Chapter 6 -- SVM

04 | 后台登录:基于账号密码的登录方式(上)

Self study notes on Apache file management -- mapping folders and configuring Apache virtual machines based on single IP and multi domain names

Calculation of array serial number of force deduction questions (daily question 7/28)

What is SOA (Service Oriented Architecture)?

【FreeSwitch开发实践】UniMRCP编译与安装

Wechat's crazy use of glide - life cycle learning

July 28, 2022 Gu Yujia's study notes
随机推荐
mysql的timestamp存在的时区问题怎么解决
01-sdram: Code of initialization module
C陷阱和缺陷 第3章 语义“陷阱” 3.2 非数组的指针
Learn more than 4000 words, understand the problem of this pointing in JS, and handwrite to realize call, apply and bind
Does domestic ERP have a chance to beat sap?
Shardingsphere's level table practice (III)
Score addition and subtraction of force deduction and brushing questions (one question per day 7/27)
C陷阱与缺陷 第2章 语法“陷阱” 2.6 “悬挂”else引发的问题
MYCAT read / write separation configuration
shell脚本总结
Verilog: blocking assignment and non blocking assignment
Apache文件管理自学笔记——映射文件夹和基于单ip多域名配置apache虚拟机
【打开新世界大门】看测试老鸟如何把API 测试玩弄在鼓掌之间
C language programming | exchange binary odd and even bits (macro Implementation)
MYSQL入门与进阶(十四)
融云 IM & RTC 能力上新盘点
军品三大基线(功能基线、分配基线、产品基线)及基线包含的文件
Example analysis of while, repeat and loop loops in MySQL process control
Singleton mode (hungry and lazy)
MySQL installation and configuration super detailed tutorial and simple database and table building method