当前位置:网站首页>Embedded exit (review and release)
Embedded exit (review and release)
2022-06-30 01:24:00 【weixin_ forty-five million eight hundred and seventy-nine thous】
One 、 Exit result
test result | Criteria |
The test passed | 1. Embedded firmware 、 There is no at each end of the panel P1、P2、P3 Legacy of Bug 2. Test case coverage 100% The function point , Regression testing covers modification points and impact areas |
The test failed | 1. There is P1\P2\P3 Remaining defects 2. There are serious user experience issues 、 Serious performance problems 3. There is P3、P4 Defect problem , however PM The assessment still needs to be revised , The customer has other online feedback that needs to be modified |
Pass with risk | 1. The embedded test passed without risk ! |
Two 、 Detailed rules for exit permit
Approved content | explain |
Demand fulfillment | 1、 The demand realization rate is 100% 2、 If the requirements have not been realized, the review description is required 3、 If the requirements are changed, there must be a requirement change review description 4、 Requirements have been planned and implemented , However, this function is not implemented during the test , It is necessary to give a description of the unfulfilled requirements |
Test content | 1、 What does the test do , Include features 、 performance 、 stability 、 pressure 、 Compatibility ( mobile phone / Router compatibility ) Etc 2、 Demand coverage measurement , What are the tests , Those not tested , If the test is not conducted, the reason and risk assessment shall be conducted |
Test situation | 1、 Use case execution 2、 Defect statistics ( Including but not limited to round defect convergence 、 Defect grade distribution 、 Defect module distribution , Defect distribution at each end, etc ) |
remaining problems | 1、 After the test, solve the remaining problems , By testing 、 Research and development 、PM And so on 2、 The remaining problems need to be explained by the corresponding R & D, such as : scope , Solution time , Avoidance measures, etc |
risk assessment | 1、 There are risk points in the release of analysis projects with different dimensions 2、 The test angle gives the risk points of the project |
Test summary / score | 1、 Project health score , Score according to different stages of the whole project 2、 Test item summary , Including use case execution 、 Defect data 、 Remaining problems and risk items 、 Project health score, etc |
3、 ... and 、 risk analysis
1、 risk assessment
Risk analysis point | The measure |
Test adequacy risk | 1、 Some required functions of the equipment have not been realized , However, it has been marked in the operation manual for import or shipment , But the customer can accept , Urgent shipment required / On the shelves 2、 Some product requirements function point tests are not covered by the test environment 3、 Some functions are not tested due to test tailoring |
Risk of remaining defects | 1、 Product presence P1/P2 remaining problems , But the customer can accept 2、 Product presence P3/P4 remaining problems , however PM And R & D and other evaluations that do not need to be modified or maybe the version is modified iteratively |
Test resource risks | 1、 The test environment required by the product cannot 100% cover , There may be unpredictable problems 2、 There are some differences between the simulation test environment and the real use of customers , The protocol or standard used in the product has certain differences due to its geographical location or time , Unable to reach the actual demand point 3、 Insufficient auxiliary class test resources , Resulting in inadequate testing ( For example, the compatibility test may be because the router or mobile phone model company does not exist yet , Result in failure to test ) |
Other risks | 1、 Some situations in the project process or other nodes that may lead to unstable product quality , Such as points requiring multi-party review ,PM Make a unilateral decision, etc 2、 Unknown risks other than test cases |
2、 Risk level reference
Probability of occurrence and scope of influence | No impact | Slight impact | General impact | serious influence | Deadly effects |
Subtle ( | low | low | low | low | in |
Not likely (0.2%~25%) | low | low | low | in | in |
Possible (26%~50%) | low | low | in | in | high |
Probably (51%~75%) | low | in | in | high | high |
Almost certain (76%~100%) | low | in | high | high | high |
remarks : The specific risk level also needs to be evaluated and judged according to the actual situation , The letter of acceptance form only provides the risk points and top-level range that can be considered
Four 、 Publishing process
Online review process :

remarks : Release the review for the remaining problems of the project , I must ask the relevant R & D personnel or product manager of the project to give me a risk assessment , Circumvention measures , scope , Solutions, etc , The tester shall review the project according to the above items
边栏推荐
- How to view the size of all files in a folder?
- Quality management of functional modules of MES management system
- Analysis of natural frequency and buckling load of cylinder by finite element method
- Visual studio 2017 cannot open the include file: 'qopenglfunctions_3_3_core': no such file or directory
- The first technology podcast month will be launched soon
- MySQL function
- 英伟达Jetson Nano的初步了解
- Solution to webkitformboundaryk in post request
- Wechat applet - requestsubscribemessage:fail can only be invoked by user tap gesture
- How to unify the use of package manager in a project?
猜你喜欢

Machinery -- nx2007 (UG) finite element analysis tutorial 2 -- assembly

How to refuse the useless final review? Ape tutoring: it is important to find a suitable review method

我,33岁,字节跳动测试开发,揭开北京“测试岗”的真实收入

Pytroch Learning Notes 6: NN network layer convolution layer

TP-LINK configure WiFi authentication method for wireless Internet SMS

postman 之接口关联

Quality management of functional modules of MES management system

Stimulus reports reporting tool, stimulus creates and builds reports

How to seamlessly transition from traditional microservice framework to service grid ASM

I learned database at station B (V): DQL exercise
随机推荐
Is the numpy index the same as the image index?
2020-12-03
JS anti shake and throttling
How to build your own blog website by yourself
我,33岁,字节跳动测试开发,揭开北京“测试岗”的真实收入
2022-06-29:x = { a, b, c, d }, y = { e, f, g, h }, x、y两个小数组长度都是4。 如果有: a + e = b + f = c + g = d + h
Kubernetes 核心对象概览详解
Ctfshow competition original title 680-695
[three.js] Web3D first experience
Seata and the three platforms are working together in the summer of programming. Millions of bonuses are waiting for you
Seata 与三大平台携手编程之夏,百万奖金等你来拿
[mrctf2020]ezpop-1 | PHP serialization
【535. TinyURL 的加密与解密】
Machinery -- nx2007 (UG) finite element analysis tutorial 1 -- simple object
一文读懂,MES管理系统模块功能
How to seamlessly transition from traditional microservice framework to service grid ASM
Application of pointer in STC89C52 single chip microcomputer and demonstration of practical cases
英伟达Jetson Nano的初步了解
第八届“互联网+”大赛 | 云原生赛道邀你来挑战
Cantilever beam calculation [matlab code]