当前位置:网站首页>The answer to the subject of Municipal Administration of the second construction company in 2022 has been provided. Please keep it
The answer to the subject of Municipal Administration of the second construction company in 2022 has been provided. Please keep it
2022-06-13 12:02:00 【Direct employment from the ground】
Second construction 《 municipal 》 I have finished the exam , Today, Xiaobian has sorted out 2022 Second year construction 《 municipal 》 The answer to the subject is as follows :

One 、 Multiple choice questions
1. About domestic waste landfill HDPE Membrane construction , The wrong is ().
A. After unfolding, drag to ensure full overlap
B. It is forbidden to lay in winter
C. Vehicles must not be in HDPE Rolling on membrane
D. Temporary paving shall be carried out in windy weather , Stop laying
【 Refer to the answer 】A
【 Reference analysis 】A Wrong option , Laying shall be carried out in place at one time , It is not suitable to drag after expanding .
2. Before the construction of municipal works , The objects that the construction technical personnel in charge must carry out detailed safety disclosure are ().
A. Construction worker
B. Quality controller
C. Operators
D. Security Officer
【 Refer to the answer 】C
【 Reference analysis 】 The construction management personnel shall be responsible for ( working procedure ) Before construction, the operators shall be provided with written technical disclosure .
3. According to the classification of urban roads , What does not belong to the urban road is ().
A. Expressway
B. The main road
C. Secondary road
D. highway
【 Refer to the answer 】D
【 Reference analysis 】 According to the position of the road in the road network 、 Traffic functions and service functions along the line , Divided into expressways 、 The main road 、 Secondary trunk road and branch road .
Multiple choice questions
21. The main reasons for unqualified compactness of soil subgrade are ().
A. The roller is too heavy
B. The loose paving thickness of the fill is too large
C. The compaction times are too few
D. The previous soft layer has not been treated
E. Layered filling with different soil properties
【 Refer to the answer 】BCD
【 Reference analysis 】 The compactness of subgrade construction cannot meet the requirements of quality standards , Even partial ” Spring soil ” The phenomenon , The main reason is :
VX The small program starts from the ground VX The small program starts from the ground VX The small program starts from the ground VX The small program starts from the ground VX The small program starts from the ground VX The small program starts from the ground —— A study , Life changing
(1) The compaction times are unreasonable : (2) The quality of the roller is too small ;(3) The loose paving thickness of the fill is too large ;(4) Uneven rolling ; (5) The moisture content is greater than the optimum moisture content , In particular, it exceeds the optimum water content by two percentage points , cause “ Spring ” The phenomenon .(6) There is no treatment for the surface floating soil or soft layer of the previous layer .(7) There are many kinds of soil in the soil field , Mixed filling of heterogeneous soil occurs ; Especially, the soil with poor water permeability wraps the soil with good water permeability , Forming a water sac , cause “ Spring ” The phenomenon .(8) The filling particles are too large , The gap between particles is too large , Or use non-conforming fillers .
22. The utility of the geotextile in road engineering is ().
A. Filtration and drainage
B. Subgrade protection
C. Easy to plant grass
D. Reinforcement of abutment back filling
E. Embankment reinforcement
【 Refer to the answer 】ABDE
【 Reference analysis 】 Use of geosynthetics :
(1) Embankment reinforcement
(2) Abutment subgrade filling and reinforcement
(3) Filtration and drainage
(4) Subgrade protection

That's all 2022 Second year construction 《 municipal 》 Part of the answer question , Full version 《 municipal 》 Answer to the subject , You can see the picture above .......
边栏推荐
- SMS based on stm32f103+as608 fingerprint module +4x4 matrix key +sim900a - intelligent access control card system
- 基于STM32F103——矩阵按键+串口打印
- 基于STM32F103——SIM900A发送短信+串口打印
- [tcaplusdb knowledge base] Introduction to tcaplusdb tcapulogmgr tool (II)
- Interview skills Q & A
- camunda如何使用script脚本节点
- 2022年二建《公路》科目答案已出,请收好
- 2022.2:EyeshotPro EyeshotUltimate EyeshotFem
- 自己炒股怎么开户?安全可靠吗?
- 7.5.4:Spire Office for . NET New Version
猜你喜欢

UE4,UE5虚幻引擎,Command Console控制台命令,参数集

SMS sending + serial port printing based on stm32f103-sim900a

全网最全,含面试题+答案

轻量级实时语义分割:ENet & ERFNet

Process of manually encrypting and burning the mass production firmware of ESP equipment

Query the current number of computer CPU cores

How vscode converts a tab key in an edited file into a spacebar

Wallys/Network_ Card/DR-NAS26/AR9223/2x2 MIMO

基於STM32F103+AS608指紋模塊+4X4矩陣按鍵+SIM900A發短信——智能門禁卡系統

The most complete network, including interview questions + Answers
随机推荐
Query the current number of computer CPU cores
What is the appropriate setting for the number of database connections?
SMS based on stm32f103+as608 fingerprint module +4x4 matrix key +sim900a - intelligent access control card system
How fastapi responds to file downloads
[tcapulusdb knowledge base] Introduction to tcapulusdb tcapsvrmgr tool (III)
web開發項目,web單頁開發
机器学习(二)—逻辑回归理论与代码详解
CPU的分支预测
致力超表面光子芯片产品研发与制造,山河光电完成数千万元Pre-A轮融资
Wallys/Network_Card/DR-NAS26/AR9223/2x2 MIMO
如何使用 DATAX 以 UPSERT 语义更新下游 ORACLE 数据库中的数据?
Web development video tutorial, web development teaching
多系统对接的适配与包装模式应用
[tcaplusdb knowledge base] Introduction to tcaplusdb tcapulogmgr tool (II)
Notes on the development of raspberry pie (16): Raspberry pie 4b+ install MariaDB database (MySQL open source branch) and test basic operations
Lvgl Library Tutorial 01- porting to STM32 (touch screen)
kubernetes 部署 ActiveMQ
5 LockSupport与线程中断
【TcaplusDB知识库】TcaplusDB表数据缓写介绍
To avoid letting the transformation enterprises go astray, it is time to re understand the integration of xiahu warehouse| Q recommendation