当前位置:网站首页>The latest Ningxia construction safety officer simulation question bank and answers in 2022
The latest Ningxia construction safety officer simulation question bank and answers in 2022
2022-06-12 19:43:00 【100% question bank app】
The 100% question bank provides the examination questions for the construction safety officer 、 Safety officer certificate The real exam question 、 Safety officer certificate examination question bank, etc , Provide online questions and brush questions , Online mock exam , Help you pass the exam easily .

154.() Mechanical equipment , The test or trial run shall be carried out according to the requirements of relevant regulations .
A. After half a year of operation
B. New purchase
C. maintain
D. overhaul
E. Technological transformation
answer :BDE
155.() The soil is uniform and the groundwater level is lower than the bottom of the old foundation , The depth of excavation exceeds 1m when , Slope setting or support measures shall be taken as required .
A. Miscellaneous fill
B. Plain fill
C. Cohesive soil
D. Gravel soil
E. Sand
answer :ABDE
156. The construction deviation of soil nailing wall shall comply with () requirement .
A. The length of soil nail rod body shall not be less than the design length
B. The allowable deviation of soil nailing position shall be 120mm
C. The allowable deviation of soil nailing inclination shall be 3°
D. The allowable deviation of the spacing of reinforcement mesh shall be ± 0 30mm
E. The allowable deviation of perpendicularity of micro pile shall be 1.5%
answer :ACDE
157. Field strength test of sprayed concrete for soil nail wall surface , Every time 500m2 Number of tests for sprayed concrete area ().
A. There should be no less than one group
B. Not less than two groups
C. Each group of test blocks shall not be less than 3 individual
D. Each group of test blocks shall not be less than 4 individual
E. Each group of test blocks shall not be less than 5 individual
answer :AC
158. Steel support members can be ().
A. Screw thread steel B. Steel pipe
C. reinforced D. Profile steel slide worker E. Steel plate one floor
answer :BD
159. The rod body of the reinforced anchor rod should be ().
A. Prestressed deformed steel bar
B. Ordinary deformed bar
C. Prestressed reinforcement
D.HRB400 Deformed bars
E.HRB500 Deformed bars
answer :ADE

160. Anchor bolt grouting shall adopt ().
A. Cement slurry
B. cement mortar
C. mortar
D. Lime slurry
E. Lime mortar
answer :AB
161. Anchor bar steel composite waist beam can be selected ().
A. Single channel steel
B. Double channel steel
C. Simplex steel
D. Duplex word steel
E. Angle steel
answer :BD
162. When the anchor rod body is HRB400,HRB500 When reinforcing steel , Its connection should adopt ().
A. Single side lap welding
B. Double sided lap welding
C. Single side upper welding
D. Double sided upper welding
E. Mechanical connection
answer :BDE
163. Of monitoring instruments used for monitoring items of foundation pit () It should be able to reflect the actual situation of the monitoring object .
A. precision
B. Resolution
C. Measurement accuracy
D. model
E. Parameters
answer :ABC
164. During on-site inspection, the side wall of the foundation pit and the water cut-off curtain shall be checked for any ().
A. deformation
B. Seepage
C. Water leakage
D. Quicksand
E. tilt
answer :BCD
165. During on-site inspection, the soil nailing wall shall be checked for ().
A. The soil nail slipped
B. Cracking of soil nailing wall surface
C. Wrong movement
D. Seepage
E. Water leakage
answer :ABC
166. During site inspection, the anchor rod shall be checked for ().
A. The anchor rod is inclined
B. The anchor head is loose
C. The anchor clip slides
D. Deformation of waist beam and support
E. Broken connection
answer :BCDE
167. It is strictly forbidden to place on the upper part of the landslide ().
A. Pile soil
B. Stacking materials
C. Park construction machinery
D. Set up temporary facilities
E. Set up protective railings
answer :ABCD
边栏推荐
- 今晚7:00 | PhD Debate 自监督学习在推荐系统中的应用
- Research Report on current market situation and investment prospect of China's tobacco RFID industry 2022-2027
- Shell 数组和函数
- exec函数、shell的实现
- leetcodeSQL:602. Friend application II: who has the most friends
- 进程的创建fork()、消亡wait()
- The component style set by uniapp takes effect in H5 and app, but does not take effect in wechat applet. The problem is solved
- 2022年,中国大学生最多的20个城市
- IO流基础知识详解--文件及IO流原理
- Demand and business model innovation-4-strategy
猜你喜欢

Demand and business model analysis -6- five topics

【生成对抗网络学习 其三】BiGAN论文阅读笔记及其原理理解

开源深度学习框架PlaidML安装及测试

system()

2022年最新宁夏建筑安全员模拟题库及答案

Shell 数组和函数

VC Hacon Joint Programming genimage3extern writeimage
![[digital ic/fpga] data accumulation output](/img/58/8d10e41a7bc837feba677f1e0b1ceb.png)
[digital ic/fpga] data accumulation output

User and group permissions

Understand Jack Dorsey's web5 from the ppt on page 16
随机推荐
Fault analysis | a case of MySQL remote slave database replication delay
const
PHP converts total seconds to hours, minutes and seconds
负数取余问题
从16页PPT里看懂Jack Dorsey的Web5
Process creation fork (), demise wait()
3D object detection
Module 8 operation
review. JS ppt math formula cannot be displayed
Hardware test - why not use grounding clip for ripple test
今晚7:00 | PhD Debate 自监督学习在推荐系统中的应用
What are meta-inf and WEB-INF respectively?
DACOM G150 dual-mode earphones make sound for love and protect the healthy growth of children's hearing
解释器文件
Promise to solve hell function calls can be used infinitely
mysql的增删改查,mysql常用命令
合理地配置线程池
leetcodeSQL:578. Questions with the highest response rate
【刷题笔记】线段树
“即服务”,未来已来,始于现在 | IT消费新模式,FOD按需计费