当前位置:网站首页>SMT Mounter workflow
SMT Mounter workflow
2022-06-26 00:16:00 【Mounter】
Smt Mounter workflow
The working process of the mounter roughly includes the following processes : Incoming plate pcb Plate fixing - Suction nozzle selection -feeder choice – Component pick – Component detection – Displacement positioning – Component placement and mounting — Out of the board
To be installed pcb The plate enters the working area of the mounter and is fixed at the predetermined position ;
The element passes through the feeder , According to the position set by the program , Install it at the suction position of the mounting head of the mounter
The mounting head moves to the suction position , Turn on the vacuum , The suction nozzle absorbs the corresponding components set by the program through negative pressure , Then the sensor is used to detect whether the element is sucked ;
The mounting head uses a visual recognition and positioning system , Read the component characteristics of the catalog and compare them with the extracted components ( For example, appearance 、 Size, etc ), If not, throw the components into the waste box , If yes, calculate the central position and angle of the element ;
According to the set procedure , The mounting head moves to the position set by the program , Align the component center with PCB The plate mounting position points coincide ;
The mounting head lowers the suction nozzle to the programmed height ( The mounting height of components is set in advance in the library ), Turn off the vacuum , Mount the components to PCB Corresponding pad ;
PCB After all the board components are installed , Return the suction nozzle ,pcb Transfer to the next track by track smt working procedure , So again and again , Do more pcb Plate mounting work
边栏推荐
- Deploy Ogg on the same machine and test
- Apache基金会正式宣布Apache InLong成为顶级项目
- Redux workflow explanation + small examples
- Topic36——53. Maximum subarray and
- Shredding Company poj 1416
- dhcp复习
- mysql 主从复制
- JS to input the start time and end time, output the number of seasons, and print the corresponding month and year
- 毕业季 | 在不断探索中拟合最好的自己
- 贴片加工厂家讲解__ICT是什么?主要测试什么?ICT测试的优缺点?
猜你喜欢

Literature research (II): quantitative evaluation of building energy efficiency performance based on short-term energy prediction

How postman tests interfaces that require login

dhcp复习

Redis memory elimination mechanism

10.4.1、數據中臺

Mysql5.7.31自定义安装详细说明
![[advanced ROS] Lecture 1 Introduction to common APIs](/img/25/85e8c55605f5cc999a8e85f0a05f93.jpg)
[advanced ROS] Lecture 1 Introduction to common APIs

ASA如何配置端口映射及PAT

【ROS进阶篇】第一讲 常用API介绍

10.2.3、Kylin_ The dimension is required for kylin
随机推荐
mysql 主从复制
Redux workflow explanation + small examples
安装PSU的时候/usr/bin/ld:warning: -z lazyload ignore
MySQL master-slave replication
no_expand和use_concat
Deploy Ogg on the same machine and test
ASA如何配置端口映射及PAT
How ASA configures port mapping and pat
Shenzhen Taipower: the way of "communication" of the United Nations
贴片机供料器(feeder)飞达的种类,如何工作
Explain in detail the three types of local variables, global variables and static variables
ORA-01153 :激活了不兼容的介质恢复
19c安装psu 19.12
When installing PSU /usr/bin/ld:warning: -z lazload ignore
redux工作流程讲解+小例子
Linux下搭建集群环境(2)-----------linux下安装Mysql
【超能云终端创领先机】如何在48小时内交付一座方舱医院?
oracle RAC 集群无法启动
huibian
Redis jump table