当前位置:网站首页>Installation points and precautions of split angle probe
Installation points and precautions of split angle probe
2022-07-28 15:57:00 【Hebei stable control technology】
Split angle probe : Different from the traditional angle probe , The split probe divides the angle probe into several detachable 、 Assembled function segment , Assemble when in use , Unpack after use , Easy to carry , Small size 、 A series of outstanding features such as adjustable wheel base . The output form of angle probe includes digital signal and analog signal , The communication interface of digital signal is RS485, The communication protocol is standard MODBUS agreement ; Analog signal is voltage output , The output range is 0~2V.
One . Connection and use of angle probe
1 . Connection of angle probe
Assemble the split angle probe with a hexagonal wrench , Check whether the installation position is accurate , Whether the assembly is firm ; The supporting steel wire rope is installed on the ring screw of the sensing section , Check whether the connection is tight . Spare after assembly .

2. How to use the angle probe
In normal use , The steel wire we are equipped with must be tied to the lifting ring above , Lower the probe .
(1). Ensure that each inclinometer is well connected with the installation accessories , Both ends of the angle probe are equipped with a guiding and positioning mechanism strictly in the same plane .
(2). When multiple angle probes are used in series , It is necessary to connect and fix a single angle probe with accessories , The installation direction of each inclinometer should be in the same plane . The installation direction should be upstream and downstream , The direction deviation should not be greater than 5°; The vertical installation deviation should be controlled within 5cm And record the installation elevation and initial inclination of each measuring point .
(3). Ensure that the inclinometer hole is vertical , The inclination of drilling hole shall be controlled within 2° within .

Two . Drilling specification requirements
Hole diameter :>=φ109mm<φ159mm The grouting treatment between the hole wall and the inclinometer pipe is required after the installation of the inclinometer probe ( Medium coarse sand can be used for drilling in soil 、 Backfilling with undisturbed soil ), During backfilling, pay attention to prevent backfill from entering the inclinometer pipe . Installation on the ground at the mouth of inclinometer pipe φ150 Flange plate , Insert the screw in advance and fix it with cement . The specification of cement table is 400*400*400( The surface height of the cement platform is 200) After installing the angle probe , Use a saw to cut a slot at the head of the inclinometer , Used to fix the instrument , Install the distribution box on the cement table , And lead the instrument connection data line to the distribution box . The measuring steel pipe should have a threading hole at the bottom , For the signal line to pass through .

1 Installation of inclinometer
(1). Use diameter 70mm ABS Inclinometer tube , Before installation, set up a support above the inclinometer hole , In order to support and hoist the inclinometer , To prevent the inclinometer pipe from falling into the hole during installation , Cause waste holes .
(2). Precautions for installation of inclinometer : First, connect the bottom cover of the inclinometer pipe with the first section of the inclinometer pipe , Cover the bottom of the pipe , Seal the connection gap with adhesive ; Inclinometer tube extension , First, on the interface diagram of the installed inclinometer pipe PVC glue , Insert the pipe joint , Then paint the nozzle of the next section of pipe PVC glue , Insert the pipe joint , Drill with a hand drill , Fix with self tapping screws of appropriate length , Lengthen section by section ; When lowering the pipe, it is mainly ensured that the direction of any pair of guide grooves of the inclinometer pipe is vertical and parallel to the installation baseline .
3、 ... and . matters needing attention
1. Angle probe is used in many occasions , The working and construction conditions are not exactly the same , Therefore, the methods of embedding and installation are also different , For general installation diagram, please refer to the diagram .
2. The installation direction of the instrument must be remembered during installation , Correctly distinguish positive 、 The corresponding relationship between negative value change and field monitoring direction , It is convenient for data analysis and judgment ;
3. According to the needs of the project, the initial value of the instrument should be subtracted from the formal use calculation data ( The first measured value after the installation and stabilization of the instrument is the initial value );
4 The aviation plug at the cable end of the instrument must be waterproof and sealed , No water 、 Moisture seeps into the cable 、 Inside the plug , Do not drag the cable , Ensure its reliability and safety .
边栏推荐
- Has won Huawei's 8.5 billion yuan screen order? Vicino responded: the customer asked for confidentiality and could not reply!
- Shell编程规范与变量
- 兆骑科创创业大赛平台,活动路演,投融资对接
- How to turn on and off flight mode through ADB
- A wave of operation to solve the error problem of Laya scene editor
- 1路编码器2路DI转速测量RS485串口连接1路DO报警模块IBF151
- Perception of life
- Remember the common JS methods of projects
- 记录一下 clearfix 清除浮动
- How to configure Samba server
猜你喜欢

2021 Kent interview question 1

【微信小程序开发(七)】订阅消息

One channel encoder, two channels Di speed measurement, RS485 serial port connected to one channel do alarm module ibf151

使用systemd管理服务

【直播预约】数据架构演进下的新挑战——上海站

深部位移监测系统wk813应用边坡、大坝、堤防、铁路和建筑基坑开挖等深部位移测量

射频模块无线收发RF63U芯片应用数据传输和基建网络

js 优先级队列

Rust Getting Started Guide (crite Management)

js中的for循环总结
随机推荐
激光测距仪非接触式地表裂缝监测仪
振弦采集模块测量振弦传感器的流程步骤?
The price war of off screen fingerprints has resumed, and second-line manufacturers are expected to win 30% of the market this year?
阿里云的rds mysql 只读实例在哪里创建
Thermistor PT100, NTC to 0-10v/4-20ma converter
仅需三步 轻松实现远程办公
High speed counter to rs485modbus RTU module ibf150
Shell programming specifications and variables
2021 Yahong pen test question 2
Remote serial port server (adapter) UART to 1-wire application
How to build opengrok code server
Virturalbox solves the problem of kernel driver
Software architecture and design (VI) -- hierarchy
Two special functions (arrow function and method)
IFD-x 微型红外成像仪(模块)的温度测量和成像精度
使用py,根据日志记录自动生成周报
一次失败的破解经历
R语言使用GGally包的ggpairs函数可视化分组多变量的两两关系图、设置alpha参数改变图像透明度、对角线上连续变量密度图、离散变量条形图、两两关系图中包含散点图、直方图、箱图以及相关性数值
Learn RX programming from me -- concat
VM501开发套件开发版单振弦式传感器采集模块岩土工程监测