1、 When performing an activity on the critical path , The functional director will transfer two project resources related to this activity to support the resolution of an emergency situation , What should the project manager do ?
A. Implement emergency plan
B. Follow up the critical path quickly
C. Negotiate with functional managers to allocate alternative resources
D. Escalate the problem to the superior of the functional manager
1. analysis :A It's a reference answer . The availability of resources on the critical path should have been identified as a risk ( Effective resource planning needs
Consider the availability and competition of scarce resources , And prepare corresponding plans .), Implement the emergency plan when the risk occurs . knowledge
spot : chapter 11.5.2.6.
2、 Due to non-compliance with a contract clause , May lead to project delay . What should the project manager do next ?
A. Update risk register , And implement new risk response
B. Update schedule , Update and adjust cost estimates , And notify the sponsor
C. Consult the legal department , Propose new mitigation measures , And update the project schedule
D. Update risk management plan , Make a change request for the schedule , And inform the customer
2. analysis :A It's a reference answer . It is a risk that the project may be delayed , Need to update the risk register and actively respond . knowledge
spot : chapter 11.2.3.1.
3、 There are several risks identified from the beginning of a project , These risks are constantly changing throughout the project , The project manager must ensure that the schedule and budget are consistent with the current status of these risks . What tools or techniques should the project manager use ?
A. Risk audit
B. Deviation and trend analysis
C. Reserve analysis
D. Risk reassessment
3. analysis :C It's a reference answer . Ensure that the schedule and budget are consistent with the current status of these risks , That is to determine the storage
Preparation is still reasonable . Knowledge point : chapter 11.7.2.1.
边栏推荐
猜你喜欢
STM32F030F4驱动TIM1637数码管芯片
The digital summit is popular, and city chain technology has triggered a new round of business transformation
What is the relationship between modeling and later film and television?
有些能力,是工作中学不来的,看看这篇超过90%同行
CADD课程学习(3)-- 靶点药物相互作用
Istio、eBPF 和 RSocket Broker:深入研究服务网格
The last packet sent successfully to the server was 0 milliseconds ago. The driver has not received
Jielizhi, production line assembly link [chapter]
2022 safety officer-c certificate examination question simulation examination question bank and simulation examination
2022安全员-C证考试题模拟考试题库及模拟考试
随机推荐
Cisco -- highly available and reliable network examination
mysql binlog的清理
神经网络物联网的发展趋势和未来方向
众昂矿业:发展以氟化工为主的特色化工产业具有先天优势
会声会影2022智能、快速、简单的视频剪辑软件
Switch to software testing, knowing these four points is enough!
Cisco test -- the concept and configuration test of routing
vim给目录加颜色
shell 自定义函数
毕业季,既是告别,也是新的开始
AAAI22 | 结构标记和交互建模:用于图分类的“SLIM”网络
建模和影视后期有什么关联?
[micro service sentinel] sentinel integrates openfeign
Jielizhi, production line assembly link [chapter]
Redis~02 cache: how to ensure data consistency in MySQL and redis when updating data?
What is the relationship between modeling and later film and television?
赵福全:短期解决保供,长期要打造安全、高效有韧性的供应链
关于游戏性能优化的一些感想
距离度量 —— 汉明距离(Hamming Distance)
What is mosaic?