当前位置:网站首页>Daily three questions 6.29
Daily three questions 6.29
2022-07-01 23:20:00 【FightAlita】
1、 When performing an activity on the critical path , The functional director will transfer two project resources related to this activity to support the resolution of an emergency situation , What should the project manager do ?
A. Implement emergency plan
B. Follow up the critical path quickly
C. Negotiate with functional managers to allocate alternative resources
D. Escalate the problem to the superior of the functional manager
1. analysis :A It's a reference answer . The availability of resources on the critical path should have been identified as a risk ( Effective resource planning needs
Consider the availability and competition of scarce resources , And prepare corresponding plans .), Implement the emergency plan when the risk occurs . knowledge
spot : chapter 11.5.2.6.
2、 Due to non-compliance with a contract clause , May lead to project delay . What should the project manager do next ?
A. Update risk register , And implement new risk response
B. Update schedule , Update and adjust cost estimates , And notify the sponsor
C. Consult the legal department , Propose new mitigation measures , And update the project schedule
D. Update risk management plan , Make a change request for the schedule , And inform the customer
2. analysis :A It's a reference answer . It is a risk that the project may be delayed , Need to update the risk register and actively respond . knowledge
spot : chapter 11.2.3.1.
3、 There are several risks identified from the beginning of a project , These risks are constantly changing throughout the project , The project manager must ensure that the schedule and budget are consistent with the current status of these risks . What tools or techniques should the project manager use ?
A. Risk audit
B. Deviation and trend analysis
C. Reserve analysis
D. Risk reassessment
3. analysis :C It's a reference answer . Ensure that the schedule and budget are consistent with the current status of these risks , That is to determine the storage
Preparation is still reasonable . Knowledge point : chapter 11.7.2.1.
边栏推荐
- AirServer最新Win64位个人版投屏软件
- Zhao Fuquan: to ensure supply in the short term, we should build a safe, efficient and resilient supply chain in the long term
- Detailed explanation of twenty common software testing methods (the most complete in History)
- 物联网现状及未来发展趋势
- Design of ESP automatic download circuit
- 毕业季,既是告别,也是新的开始
- window安装wsl(二)
- Treatment of insufficient space in the root partition of armbain system
- 每日三题 6.30
- Glass mosaic
猜你喜欢
Compare the version number [double pointer to intercept the string you want]
建模和影视后期有什么关联?
从第三次技术革命看企业应用三大开发趋势
马赛克后挡板是什么?
毕业季,既是告别,也是新的开始
The last packet sent successfully to the server was 0 milliseconds ago. The driver has not received
2022 crane driver (limited to bridge crane) examination questions and simulation examination
Yoga27 multidimensional all-in-one computer with excellent appearance and high-end configuration
window10安装wsl(一)(WslRegisterDistribution ERROR)
物联网现状及未来发展趋势
随机推荐
Zhongang Mining: it has inherent advantages to develop the characteristic chemical industry dominated by fluorine chemical industry
Which securities company is better and which is safer to open a securities account
认识--Matplotlib
The online beggar function of Japanese shopping websites
flutter Unable to load asset: assets/images/888. png
日本购物网站的网络乞丐功能
云信小课堂 | IM及音视频中常见的认知误区
2022年危险化学品经营单位安全管理人员考试题及在线模拟考试
dat.GUI
OpenVINO 模型性能评估工具—DL Workbench
神经网络物联网的未来趋势与发展
建模和影视后期有什么关联?
Detailed explanation of twenty common software testing methods (the most complete in History)
2022 safety officer-c certificate examination question simulation examination question bank and simulation examination
Openresty load balancing
Matplotlib常用设置
2022年起重机司机(限桥式起重机)考试试题及模拟考试
每日三题 6.30
CADD course learning (3) -- target drug interaction
[MySQL] index creation, viewing and deletion