当前位置:网站首页>2022 Tibet latest special worker (construction elevator) simulation test question bank and answers
2022 Tibet latest special worker (construction elevator) simulation test question bank and answers
2022-06-12 00:13:00 【100% question bank】
The 100% question bank provides Special workers ( Construction elevator ) Examination questions 、 Special workers ( Construction elevator ) Test prediction questions 、 Special workers ( Construction elevator ) The real exam question 、 Special workers ( Construction elevator ) Certificate examination question bank, etc , Provide online questions and brush questions , Online mock exam , Help you pass the exam easily .

174. When the construction lift is operated , Motor overheating , The wrong way to deal with it is ().
A. Adjust or replace the brake
C. Adjust the operation properly
B. Reduce cage load
D. When the power supply voltage is restored to 380V And then work
answer :A
175. All kinds of safety protection and safety devices and all kinds of... On the construction elevator () Must be complete and effective .
A. Safety attachment device
B. Safety information device
C. Safety signs
D. Security agencies
answer :B
176.() Use the guide rail frame of construction elevator 、 The scaffold shall be pulled or suspended by horizontal hard support 、 Construction pipeline 、 Rope slogan 、 Flags, etc .
A. must not
B. must
C. Sure
D. temporary
answer :A
177. The metal shell of the construction lift shall be () Or protective neutral connection , And shall comply with the provisions of the current industry standards .
A. Mutual grounding
B. Repeat protection
C. Lightning protection and neutral connection
D. Protective grounding
answer :D
178. The height of construction lift exceeds 30m Of , Shall be installed as specified () device .
A. Lightning protection and grounding protection
B. Repeat protection
C. Lightning protection and neutral protection
D. Mutual grounding protection
answer :A
179. The cage of the construction elevator vibrates excessively during operation , It is not a fault because ().
A. gear 、 The rack engagement clearance is too large
B. The connecting bolts of the guide roller are fastened
C. gear 、 Lack of lubrication for rack engagement
D. The clearance between the guide roller and the back wheel is too large
answer :B
180. The lifting cage of the construction elevator has a jumping phenomenon during operation , It is not a fault because ().
A. The rack bolt is loose
B. The docking step difference is too large
C. The guide rail frame is not deformed
D. The gear is severely worn
answer :C
181.SS The brake of type a construction elevator fails , It is not a fault because ().
A. All moving parts of the brake are adjusted in place
B. The mechanism is damaged , To obstruct movement
C. The brake lining or brake wheel is seriously worn
D. The brake lining or the connecting rivet of the brake pad is exposed
answer :A
182. When the construction lift is operated , Erratic movement , It is not a fault because ().
A. Poor line contact
B. The terminal wiring is loose
C. Reset is normal
D. The contactor is stuck
answer :C
183.SS It is not a fault that the lifting cage of type a construction elevator cannot be lifted normally. The reason lies in ().
A. In winter, the lubricating oil of reduction gearbox is too thick
B. Operation overload or superelevation
C. The latch of the docking device extends out and hangs on the rack
D. The brake is completely disengaged
answer :D

184. The brake of construction elevator fails , The motor is difficult to start and has abnormal noise , It is not a fault because ().
A. The rectifier element is damaged
B. The motor brake is open
C. The lift is seriously overloaded
D. The supply voltage is much lower than 360V
answer :B
185. The brake torque of the construction elevator brake is insufficient , It is not a fault because ().
A. There is oil dirt between the brake lining and the brake wheel
B. The brake spring is too loose
C. The movable hinge is stuck
D. The parts at the movable hinge are worn normally
answer :D
186. When the construction lift is operated , On the hanging cage 、 There is a self-stop phenomenon during the lower operation , It is not a fault because ().
A. On 、 The lower limit switch has poor contact or is damaged
B. Serious overload during operation
C. The control device has poor contact or
D. Button 、 The handle is not damaged
answer :D
187. When the construction lift is operated , When the cage is running, the motor jumps , It is not a fault because ().
A. The motor fixture is stable
B. The motor fixing device is loose
C. The motor rubber pad is damaged or lost
D. The connecting bolts between the reduction gearbox and the transmission plate are loose
answer :A
188. When the construction lift is operated , The cage swings during operation , It is not a fault because ().
A. The connecting bolt of the guide roller is loose
B. The connecting bolts of the guide roller are fastened
C. Support plate bolts are loose
D. The connecting bolts between the reduction gearbox and the transmission plate are loose
answer :B
189. When the construction lift is operated , There is a jump when the cage starts or stops running , And the reason is that ().
A. The motor braking torque is too large
B. The rubber block in the coupling of motor and reducer is damaged
C. The motor braking torque is too small
D. The rubber block in the coupling of motor and reducer is worn
answer :C
边栏推荐
- [signals and systems] (XXI) Laplace transform and complex frequency domain analysis -- Laplace transform and its properties
- How to cancel smart table style in WPS table
- 汛期化工和危险品企业如何加强防控重大安全风险
- Jenkins of the integrate tool
- 多年测试菜鸟对黑盒测试的理解
- gin解决跨域问题
- Point cloud library PCL from introduction to mastery learning records Chapter 8
- (dp+ group backpack) acwing 9 Group knapsack problem
- Summary of DOM knowledge points
- Web keyboard input method application development guide (2) -- keyboard events
猜你喜欢

The road of global evolution of vivo global mall -- multilingual solution

chisel环境搭建(win10 + vscode)

Unified certification center oauth2 high availability pit

Industrial control system ICs

Point cloud library PCL from introduction to mastery learning records Chapter 8

Share an open source, free and powerful video player library

【JUC系列】Executor框架之概览

图及图的遍历

Pre resolution and scope
![[JUC series] overview of executor framework](/img/e3/5131dcdd255c1571e64ae1f0459113.png)
[JUC series] overview of executor framework
随机推荐
组态王如何利用无线Host-Link通信模块远程采集PLC数据?
将数组分成和相等的三个部分[问题分析]
chisel环境搭建(win10 + vscode)
Environment construction 2
Use select to switch coroutines
Ar helps brand stores achieve global data growth
Notes on knowledge points of dynamic planning
Design a MySQL table for message queue to store message data
平衡二叉树(AVL 树)
The time selector style is disordered and the middle text is blocked
Experiment 7 class construction and static member function
Design principle [Demeter's Law]
WALLYS Qualcomm-Atheros-QCA9882-2T2R-MIMO-802.11ac-Mini-PCIe-WiFi 6E-Module-5G-high-power
多年测试菜鸟对黑盒测试的理解
Do you want to take the postgraduate entrance examination? Will you be able to find a good job after graduate school?
Read the 23 steps of the enterprise through the financial report
[flume] notes
SF14 | supertrend "super trend" indicator magic change and upgrade (source code)
Motianlun domestic database salon | Xu Li: Alibaba cloud's native lindorm TSDB database drives the upgrading of industrial it & ot hyper integrated digital system
ironSource  New functions are released, and developers can adjust advertising strategies in real time in the same session