Site investigation system
2022-06-10 13:05:00 【Lin fengyiyi】
One 、 Marketing field work , The issuer of the work ticket or the person in charge of the work considers it necessary to conduct on-site investigation , The site investigation shall be organized according to the work task , And fill in the site investigation records ;
Two 、 The site investigation shall be organized by the work ticket issuer or the person in charge of the work , Person in charge of the work 、 Equipment operation and maintenance management unit ( Including customers ) And maintenance ( The construction of the ) Relevant personnel of the unit shall attend . Yes, it involves many disciplines 、 Multisectoral 、 Multi unit work items , The project management department shall 、 The unit organizes relevant personnel to participate in ;
3、 ... and 、 The field investigation shall check the scope of power failure required for field operation 、 Retained live parts 、 The position where the grounding wire is installed 、 Adjacent lines 、 Multi power supply 、 Self provided power supply 、 Conditions of underground pipeline facilities and operation site 、 Environment and other dangerous points affecting the operation , And put forward targeted safety measures and precautions . According to the site investigation results , To the danger 、 Work items with greater complexity and difficulty , Organizational measures shall be prepared 、 Technical measures 、 Security measures , It shall be implemented after being approved by the unit ;
Four 、 After site investigation , The site investigation records shall be sent to the work ticket issuer 、 Person in charge of the work and relevant parties , Fill in as 、 Basis for issuing work ticket, etc ;
5、 ... and 、 Before the construction , The person in charge of the work or the issuer of the work ticket shall recheck the site investigation , It is found that there is a change from the original survey , It should be corrected in time 、 Improve the corresponding safety measures .
边栏推荐
- Software project management 6.10 Cost budget
- 百度程序员删库被判9个月,手机号一键解绑功能发布,推特再向马斯克妥协,今日更多大新闻在此...
- mTabLayout. setOnTabSelectedListener is deprecated
- Altium Designer重拾之学习资料推荐
- 從解讀 BDC 自動生成的代碼談起,講解 SAPGUI 的程序組成部分
- Dynaslam ii: carefully coupled multi object tracking and slam
- TIDB 初級課程體驗 8 (集群的管理維護, 添加一個TIKV節點)
- Mr developed by unity3d realizes model occlusion and transparent ground receiving shadow
- Comparison of two BigDecimal data types, addition, subtraction, multiplication and division, and formatting
- 今天,一对情侣拿下香港最大电商IPO
猜你喜欢

Creating basic stacks and queues in C language

UML class diagram

Some words from ShareIt group

KITTI 相关信息汇总

TIDB 初級課程體驗 8 (集群的管理維護, 添加一個TIKV節點)

Altium Designer重拾之开篇引入

用GNN做CV三大任务的新骨干,同计算成本性能不输CNN、ViT与MLP|中科院&华为诺亚开源...

Give root password for maintenace (or press Control-D to continue):解决方法

Unity3d uses URP rendering pipeline to realize ar shadow (shadow casting and transparent ground)

Oceanbase, phase II of the document promotion plan, invites you to jointly build documents
随机推荐
Unity3d uses URP rendering pipeline to realize ar shadow (shadow casting and transparent ground)
Error:top-left corner pixel must be either opaque white or transparent.
SparkStreaming实时数仓 问题&回答
KITTI 相关信息汇总
今天,一对情侣拿下香港最大电商IPO
Automatic Mapping of Tailored Landmark Representations for Automated Driving and Map Learning 论文阅读
向数据库中注册用户名和密码的功能
【移动机器人】轮式里程计原理
QA of some high frequency problems in oauth2 learning
Recommended learning materials for Altium Designer
Stereo Vision-based Semantic 3D Object and Ego-motion Tracking for Autonomous Driving 论文阅读
JS global timer case
CVPR2022|AConvNetforthe2020s&如何设计神经网络总结
Don't mistake "it informatization" for "super project"
Yet Another Palindrome Partitioning
VDMA commissioning summary
MySQL master database operation large table DDL, slave database crash and system parameter error setting
Stereo vision based semantic 3D object and ego motion tracking for automotive driving
Practical cases, in-depth analysis
How can the team be dissolved...