The 100% question bank provides the examination questions for the safety officer of the eight members of the construction team 、 Prediction of the examination of the eight members of the construction team 、 The real exam questions of the eighth senior staff 、 Safety officer certificate examination question bank, etc , Provide online questions and brush questions , Online mock exam , Help you pass the exam easily .

229. The height of primary section steel cantilever scaffold should not exceed ()m.
A.10
B.15
C.20
D.25
answer :C
230. The distance between the positioning point set at the cantilever end of the section steel cantilever beam and the cantilever beam end shall not be less than ()mm
A.100
B.150
C.200
D.250
answer :A
231. The arrangement of scaffold wall connecting parts should be close to the main node , The distance from the main node shall not be greater than ().
A.150mm
B.200mm
C.250mm
D.300mmㇼ
answer :D
232. Wall connecting parts must be set at both ends of open scaffold , The vertical spacing of wall connecting parts shall not be greater than the floor height of the building , And should not be greater than ()m.
A.2
B.3
C.4
D.5
answer :C
233. The width of the scaffold conveying chute shall not be less than ()m, The slope should not be greater than ().
A.1.2;1:5
B.1.5;1:5
C.1.5;1:6
D.1.2;1:6
answer :C
234. The width of the pedestrian ramp shall not be less than ()m, The slope should not be greater than ().
A.0.8;1:3
B.1;1:4
C.1;1:3
D.0.8;1:4
answer :C
235. A platform shall be set at the corner of the scaffold ramp , Its width should not be () Ramp width .
A. be equal to
B. Greater than
C. Less than
D. Independent of ramp width ..
answer :C
236. The end of the scaffold operation layer must be set at least ()mm Your toe board .
A.150
B.180
C.200
D.220
answer :B
237. The scaffold board shall be laid firmly 、 Strict , And double bottom with safety net , Every... Below the construction layer ()m The safety net shall be used to close the .
A.8
B.9
C.10
D.12
answer :C
238. When the scaffold board is butted and laid , The extended length of scaffold board at the joint shall be taken as (D),, The sum of the extended lengths of the two scaffold boards shall not be greater than ().
A.100mm~120mm,240mm
B.110mm~130mm,260mm
C.120mm~140mm,280mm
D.130mm~150mm,300mm
answer :D

239. The elevation of the bottom surface of the upright base plate or base of the fastener scaffold should be higher than the eye level ()
A.20mm~50mm
B.30mm~60m
C.40mm~80mm
D.50mm~100mm
answer :D
240. When the vertical pole of fastener scaffold is extended by overlapping , The lap length shall be less than ()m, No less than () Fixed with two rotary fasteners .
A.0.5,1
B.0.5,2
C.1.1
D.1.2
answer :D
241. Scaffold removal operation , must () Conduct .
A. Layer by layer from top to bottom
B. Layered from bottom to top
C. The upper and lower layers are at the same time
D. Casually dismantle
answer :A
242. The red arrow in the figure refers to what part of the scaffold ()
A. cross bar
B. Stand up
C. Cross bridging
D. guardrail
answer :B
243. What are the main problems with the scaffold in the figure :()
A. No backing plate is set
B. The bottom sweeping rod is not set
C. Cross bridging is not set
D. No drainage ditch is set
answer :B
244. What are the main problems with the scaffold in the figure :()
A. The foundation is not firm
B. The upright is not at the same horizontal height
C. The distance between the sweeping rod and the base plate is more than 200mm
D. Step length is too small
answer :C
边栏推荐
- gslb(global server load balance)技术的一点理解
- Learning multi-level structural information for small organ segmentation
- [March 3, 2019] MAC starts redis
- Another company raised the price of SAIC Roewe new energy products from March 1
- How to help others effectively
- Option (024) - do all objects have prototypes?
- Json Web token - jwt vs. Traditional session login Authentication
- Dimension and format of data
- 体验碎周报第 102 期(2022.7.4)
- Overview of convolutional neural network structure optimization
猜你喜欢

24 magicaccessorimpl can access the debugging of all methods

uniapp 自定義環境變量

AWT常用组件、FileDialog文件选择框

JSON web token -- comparison between JWT and traditional session login authentication

Download kicad on Alibaba cloud image station

Impact relay jc-7/11/dc110v

How to solve the component conflicts caused by scrollbars in GridView

SQL injection SQL lab 11~22

QT qtablewidget table column top requirements ideas and codes

体验碎周报第 102 期(2022.7.4)
随机推荐
uniapp 自定义环境变量
Invalid revision: 3.18.1-g262b901-dirty
Layoutmanager layout manager: flowlayout, borderlayout, GridLayout, gridbaglayout, CardLayout, BoxLayout
ADC voltage calculation of STM32 single chip microcomputer
High performance parallel programming and optimization | lesson 02 homework at home
Variables d'environnement personnalisées uniapp
JS get the attribute values nested in the object
27-31. Dependency transitivity, principle
buuctf-pwn write-ups (8)
微信小程序使用rich-text中图片宽度超出问题
C實現貪吃蛇小遊戲
LayoutManager布局管理器:FlowLayout、BorderLayout、GridLayout、GridBagLayout、CardLayout、BoxLayout
AWT介绍
Webrtc quickly set up video call and video conference
Distributed cap theory
Appium基础 — APPium安装(二)
Which water in the environment needs water quality monitoring
740. Delete and get points
198. House raiding
[March 3, 2019] MAC starts redis