当前位置:网站首页>Jhok-zbg2 leakage relay
Jhok-zbg2 leakage relay
2022-07-07 05:26:00 【Comprehensive operation of Shanghai Joseph Electric Appliance C】
brand :JOSEF Joseph
Product model :JHOK-ZBG1 20/5A 75/5
Action current :0.03mA~9.99A
Working voltage :AC220V/AC380V
Action time :0.02~99.99S
Installation mode : Guide rail in cabinet / Embedded panel
Zero sequence aperture :25mm~220mm
Host size :883660mm
The product name : Multi shift leakage ( The remaining ) Relay
One 、 Product overview
JHOK-ZBG series
Leakage relay ( Hereinafter referred to as relay ) Suitable for AC voltage to 660V Or higher TN、TT、 and IT System , The frequency is 50Hz. Detect the zero sequence current exceeding the setting value through the zero sequence current transformer ( The remaining ) Leakage current . The relay is connected with the circuit breaker of shunt release or voltage loss release 、 AC contactor 、 Magnetic starter and other components of leakage protection device , For leakage and electric shock protection , Can be equipped with buzzer 、 Signal and other acoustooptic devices are combined to form a leakage alarm device . Derive multiple models , Prefix such as HLJ、RLJ、ULJ Series and other models , It is actually a similar product . It plays a very important role in the power system , It is the basis to ensure the reliability of power supply .
Two 、 Product use
The leakage protection relay has small volume 、 Easy to install and use 、 Reliable movement 、 Continuous power supply is stable and easy to operate . Can adapt to users everywhere , It can be used to protect the line from ground fault , It is mainly used to prevent equipment accident or electrical fire caused by grounding fault current , It can also be used to provide indirect contact protection for the release of human electric shock .
The leakage relay can be connected with the circuit breaker with shunt release or voltage loss release 、 AC contactor 、 Magnetic starter and other components of leakage protection device , For leakage and electric shock protection , It can also be equipped with buzzer 、 Signal lamp and other acousto-optic devices are combined to form a leakage alarm device . With reset 、 instructions 、 Call the police 、 Reset and other functions .
It is not suitable for the central grounding point of power supply or direct grounding system 、 Low voltage distribution system . It is a network reform product for safe use . The action time of the relay is divided into fast type and delay type , When used together, the trunk line and branch line shall be protected by classification , It can completely replace the past LLJ-□F(S)、LLJ-□H(S)、JD1 And JD3 Series leakage relay .
3、 ... and 、 Product parameters
● Rating
Voltage rating : Rated voltage AC380V、AC660V、AC690V、AC1140V.
Working voltage value :DC24V、AC110V、AC127V、AC220V、AC380V. It can also be customized according to customer requirements .
Allowable variation range of power supply voltage : The voltage variation is the rated voltage 0.7 to 1.3 Times or wide power circuit .
Rated current value :16A、25A、32A、40A、63A、80A、100A、125A、200A、250A、320A、400A、630A、800A、1000A、1500A、1600A、2000A. Non standard point current can also be customized .
● Action value
Leakage action current : General or user-defined , Can also be 50-500mA Split gear or adjustable .
Leakage non action current : Half of the leakage action current .
Leakage action time : Delay type 0.2-2S.
Fast type ≤0.1S .
● Important parameter
The aperture of the transformer is round (L type ):M25、M45、M75、M100、M150、M160、M220.
Rectangular square ( Runway type ):45160、45220、45260、45320、45*450 etc. .
Four 、 working principle
The relay is an electronic current operated leakage relay , It is mainly composed of zero sequence current transformer 、 Electronic circuits 、 The working principle of the test circuit and outlet relay is as follows : The wiring is shown in the figure (1), Zero sequence transformer passing through the main line , When there is no leakage in the main line , The sum of vectors is equal to zero or minimal , When there is leakage or electric shock on the main line , The zero sequence transformer senses an unbalanced current vector and signal , When the circuit of zero sequence current transformer leaks to the ground iA+iB+iC≠0. Send it to the host for amplification , Check whether the leakage current exceeds the setting value , And send the results to the actuator for execution . At this time, the zero sequence current transformer will generate an induction signal , This signal is processed by electronic circuit , When the leakage current reaches the action value , Make the thyristor contact and make the relay act , Use relay normally open 、 The closing point controls the disconnection of the main circuit breaker or contactor , Cut off the fault line to achieve the purpose of protection . The test circuit is composed of resistors, buttons and other components , Press the test button , There is a current flowing through the transformer , Equivalent to the leakage current of the main line , The indicator light is on , The outlet relay should be able to act . Press the reset button , The light goes out , Outlet relay returns .
5、 ... and 、 Order needs to know
Rated current of the product 、 Leakage current 、 Transformer aperture . Rated voltage and working voltage . If delay is required , You have to specify the time .
JHOK-ZBG2 Leakage relay
1. Prevent electric shock accidents caused by leakage of electrical equipment and electrical lines ;
2. Prevent single-phase electric shock accidents during power use ;
3. Timely cut off the single-phase grounding electric shock fault in the operation of electrical equipment , Prevent fire accidents caused by electric leakage .
The working principle of leakage relay is as follows : Zero sequence transformer will pass through the main line , When there is no leakage in the main line , The sum of vectors will be equal to 0 Or very small . however , If there is leakage in the main line , The zero sequence transformer can sense that the vector sum is unbalanced , And the current vector will also send a signal to the zero sequence transformer , And send the signal to the host for amplification , We can check whether the leakage current exceeds the setting value , If the current exceeds the setting value , We can send the test results to the actuator , Let the actuator carry out maintenance, etc . Another way is , If the main line leaks electricity , The indicator light will be on , The outlet relay will also have a certain action and send a signal .
Shanghai Joseph relay business department
边栏推荐
- 做自媒体视频剪辑,专业的人会怎么寻找背景音乐素材?
- Talk about mvcc multi version concurrency controller?
- [PHP SPL notes]
- 模拟线程通信
- The founder has a debt of 1billion. Let's start the class. Is it about to "end the class"?
- 利用OPNET进行网络单播(一服务器多客户端)仿真的设计、配置及注意点
- NPDP产品经理认证,到底是何方神圣?
- Knapsack problem (01 knapsack, complete knapsack, dynamic programming)
- LinkedBlockingQueue源码分析-初始化
- 删除文件时提示‘源文件名长度大于系统支持的长度’无法删除解决办法
猜你喜欢
Under the trend of Micah, orebo and apple homekit, how does zhiting stand out?
SQL injection cookie injection
LabVIEW is opening a new reference, indicating that the memory is full
Is it necessary to renew the PMP certificate?
CentOS 7.9 installing Oracle 21C Adventures
Use Zhiyun reader to translate statistical genetics books
pytest测试框架——数据驱动
How Alibaba cloud's DPCA architecture works | popular science diagram
Two person game based on bevy game engine and FPGA
《5》 Table
随机推荐
设f(x)=∑x^n/n^2,证明f(x)+f(1-x)+lnxln(1-x)=∑1/n^2
Creation and use of thread pool
模拟线程通信
[QT] custom control loading
CentOS 7.9 installing Oracle 21C Adventures
The founder has a debt of 1billion. Let's start the class. Is it about to "end the class"?
MySQL数据库学习(7) -- pymysql简单介绍
做自媒体视频剪辑,专业的人会怎么寻找背景音乐素材?
Record a pressure measurement experience summary
[question] Compilation Principle
在米家、欧瑞博、苹果HomeKit趋势下,智汀如何从中脱颖而出?
QT simple layout box model with spring
2039: [Bluebridge cup 2022 preliminaries] Li Bai's enhanced version (dynamic planning)
Batch size setting skills
DFS, BFS and traversal search of Graphs
Auto. JS get all app names of mobile phones
利用OPNET进行网络任意源组播(ASM)仿真的设计、配置及注意点
人体传感器好不好用?怎么用?Aqara绿米、小米之间到底买哪个
Knapsack problem (01 knapsack, complete knapsack, dynamic programming)
Timer create timer