当前位置:网站首页>Summary of skills in using ms project2010 project management software
Summary of skills in using ms project2010 project management software
2022-07-30 05:02:00 【Ke Daxia loves to drink water】
Background
The whole article is explained by taking 2010 as an example. Subsequent versions are similar and will be updated one after another, little by little
Set project start time
How do you assign each of your tasks back to the start of your project, rather than starting on a date that's long overdue?
How to set the calendar and time
The calendar that comes with the project is more general, but it is not suitable for everyone, so when you want to use it to plan a project, always create it according to your company's working hours:
- Go to "Project → Properties → Change Working Hours Options", open


- Create a new calendar, there are two places to pay special attention to, the exception date and the work week
- Exception dates: refers to the dates you choose, which are supplementary rules that cannot be expressed normally in the "working week"
a. For example: You set the working hours to be Monday to Friday every week, at 8:00 a.m.Until 5 o'clock in the evening, but the company benefits, you can get off work at 12 o'clock on the last Friday of every month, at this time, you can set it through the exception date
Duration listed as a decimal problem
After manually setting your own calendar, if you do not modify the schedule time of the project, there will be a problem that the construction period is decimal days
Tips
Decimals are usually caused by non-integer days. It is recommended that you adjust the system time format so that the interface displays hours, which can help you adjust the calendar
project-options-general
Solution
- Modify the project-options-schedule column:
- Default start time: It must be earlier than or equal to the start time set by yourself in your calendar-work week, otherwise there will be a decimal (the reason is that if the start time of your calendar is 8:00,If the default start time is 9:00, then you set a one-day duration, starting from 8:00, the project will think that you need two days to combine)
- Default end time: later than your calendar-workweek end time set by yourself, for the same reason as above
- Daily working hours: To be equal to (equal to equal to equal to say important things three times) your calendar-workweek self-set working hours
- These three steps are completed, and there will be no decimals.

Transitional assignment of resources for this task
When creating a summary task with multiple subtasks, the 'Transitional allocation of resources for this task' little red man prompt often appears,
Reason: Summary row – resource column, check the same resource as the subtaskconflict
Solution
Cancel the "Resource" assignment from the Summary row
How to compare the plans and changes of each duration period
1. After creating a new project, set a benchmark
For the first creation, select "Comparison Baseline 0" in sequence, and then you can overwrite the creation, or you can create new benchmarks in different periods

2. After a period of time, compare the project
In the blank space on the right side of the Gantt chart, select "Show/Hide Bar Chart Style" - "Baseline" - Baseline (which you created earlier)
Then, the comparison page appears, the gray part below is your original benchmark, and the black part above is the current oneSome schedules
The specific color is subject to the style you set
Benchmarking Tips
After setting the benchmark, try not to modify the task name, task order, add tasks, etc., which will cause confusion in the comparison
边栏推荐
- Unity3D Application simulation enters the front and background and pauses
- ThinkPHP高仿蓝奏云网盘系统源码/对接易支付系统程序
- WPF introduces ttf icon file usage record
- LeetCode Algorithm 328. 奇偶链表
- webService interface
- js operation to add or subtract from the current date (day, week, month, year)
- POJ1321 棋盘问题(详解)
- Plan for many situations in the processing chain
- Naive Bayes Classification
- file system two
猜你喜欢

Protobuf compound data types, speaking, reading and writing

Machine Learning: Knowing the Dimensionality Reduction Process Through Low Variance Filtering
![[MRCTF2020]Hello_misc](/img/ea/0faacf6e544b60e3459d8ace4d5f42.png)
[MRCTF2020]Hello_misc

解决报错SyntaxError: (unicode error) ‘utf-8‘ codec can‘t decode byte 0xb7 in position 0: invalid start b

Discourse Custom Header Links

ThinkPHP高仿蓝奏云网盘系统源码/对接易支付系统程序

Verify that the addShutdownHook hook takes effect

IGBT wafers used in photovoltaic inverters

Compound Types--references, pointers

Repetition XXL - JOB scheduling center background arbitrary command execution
随机推荐
GO语言学习笔记一
Hexagon_V65_Programmers_Reference_Manual(10)
3. Dependency configuration management
字符串问题(上)
Golang eight-legged text finishing (continuous handling)
Predictive maintenance scheduling of multiple power equipment based on data-driven fault prediction
【Vitis】ZCU102开发板PS端控制PL端复位的代码实现
LeetCode Algorithm 328. 奇偶链表
Usage of EFR32 as sniffer for Zigbee/Thread
Hexagon_V65_Programmers_Reference_Manual(11)
error: The following untracked working tree files would be overwritten by
webService接口
Become a qualified cybersecurity, do you know this?
Unity踩坑记录 —— GetComponent的使用
Unity beginner 5 cameras follow, border control and simple particle control (2 d)
The Double Pointer Problem (Part 2)
How with Mexico Volkswagen VW EDI connection to Mexico
C语言实现安全性极高的游戏存档并读档
Hexagon_V65_Programmers_Reference_Manual(12)
六、读取应用配置+日志配置