The latest test questions and answers for the eight major members (standard members) of Ningxia architecture in 2022
2022-06-11 19:40:00 【100% question bank app】
The 100% question bank provides Building eight ( Standard Officer ) Examination questions 、 Building eight ( Standard Officer ) The real exam question 、 Building eight ( Standard Officer ) Certificate examination question bank, etc , Provide online questions and brush questions , Online mock exam , Help you pass the exam easily .

13. The registered constructor requests to cancel or change the registration , It shall provide effective proof materials for the termination of labor relations with the original employing enterprise . The competent construction department has verified with the original employer , Employing enterprises in () There is no written objection and relevant supporting materials provided within , Cancellation or change of registration shall be handled .
A.3 Japan
B.7 Japan
C.15 Japan
D.30 Japan
answer :B
analysis : The competent construction department has verified with the original employer , Employing enterprises in 7 Failing to provide written objections and relevant supporting materials within days , Cancellation or change of registration shall be handled .
14. The core and foundation of building a legal system is ().
A. The constitution
B. Construction Law
C. Construction administrative regulations
D. Construction Law of the people's Republic of China
answer :B
analysis : The construction of laws is the core and foundation of the construction of the legal system .
15. The project management documents signed and sealed by the registered constructor shall be valid , Regarding this , When the following situations occur in practice , The right thing to do is ().
A. When a construction project involves multiple disciplines , The project construction management documents shall be signed and sealed by the chief supervision engineer
B. When a construction project involves multiple disciplines , The construction management documents of the project shall be signed and sealed by the registered constructor who is the person in charge of the construction project
C. When modifying the construction management document signed and sealed by the registered constructor , The registered constructor with the same qualification shall be appointed by the enterprise
D. The construction management documents of the subcontracted project shall be signed and sealed by the registered constructor of the general contractor
answer :B
analysis : The construction project contract includes several professional projects , A registered constructor who is the person in charge of the construction project , Be responsible for signing and sealing the construction management documents of the project . The modification of the project construction management documents signed by the registered constructor and stamped with the practicing seal shall be subject to the consent of the enterprise , It shall be modified by the registered constructor himself . The construction management documents of the subcontracting project shall be signed and sealed by the registered constructor of the subcontracting enterprise . The subcontractor shall sign the qualified documents , It must be signed and sealed by the registered constructor who is the principal of the EPC project .
16. Revision of emergency rescue plan for production safety accidents of production and business operation entities , The following statement is correct ().
A. There is no need to revise after formulation
B. The amendment shall be made only in case of legal change
C. There is no way to change things , At least every 3 Revised once a year
D. The revised emergency plan does not need to be filed
answer :C
analysis :《 Measures for management of emergency plan for production safety accidents 》 Regulations , The emergency plan formulated by the production and business operation entity shall be prepared at least every month 3 Revised once a year , The revision of the plan shall be recorded and filed .
17. according to 《 Construction law 》 The provisions of the , The following are covered by warranty ().
A. Heat supply 、 Cooling system engineering
B. Quality defects caused by improper use
C. Quality defects caused by third parties
D. Quality defects caused by force majeure
answer :A
analysis :《 Construction law 》 The first 62 Stipulated in article , The quality warranty system shall be implemented for construction projects . meanwhile , The scope and duration of quality warranty are also specified : The scope of warranty for construction works shall include foundation works 、 The main structure project 、 Roof waterproofing works and other civil works , And electrical pipelines 、 Installation of water supply and drainage pipelines , Heat supply 、 Cooling system engineering, etc .

18. according to 《 Labor contract law 》 The provisions of the , In the following options , The employer advanced 30 Notify the laborer in writing within days or pay extra 1 The situation where the labor contract can be terminated after months' salary is ().
A. A worker who is ill or injured outside of work is incompetent for his original job after the prescribed medical treatment period expires
B. The laborer is proved not to meet the employment conditions during the probation period
C. The laborer is investigated for criminal responsibility according to law
D. The worker is incompetent , Those who are still incompetent after training or post adjustment
answer :D
analysis :《 Labor contract law 》 The first 40 Stipulated in article : Under any of the following circumstances , The employer advanced 30 Notice the laborer in writing or pay the laborer extra on the day of 1 After a month's salary , May dissolve the labor contract :A. The labourer suffers from illness or non-work-related injury , Cannot be engaged in original job after the medical treatment that sets expires , It is also not allowed to engage in the work arranged by the employer ;B. The worker is incompetent , After training or job adjustment , Still not up to the job ;C. Significant changes have taken place in the objective circumstances on which the labor contract is based , Cause labor contract cannot perform , Through unit of choose and employ persons and laborer consult , Failure to reach an agreement on changing the contents of the labor contract .
19. In the following statements about project subcontracting , The right is ().
A. Project construction subcontracting refers to that the contractor decomposes the bid winning project and contracts it to enterprises with corresponding qualifications for completion
B. Professional engineering subcontracting refers to that the professional engineering contractor contracts out part of the contracted professional engineering construction tasks to enterprises with corresponding qualifications
C. Labor operation subcontracting refers to that the general contractor or professional subcontractor subcontracts the labor operation in the contracted project to the labor subcontracting enterprise
D. Labor subcontracting enterprises may subcontract part of the contracted labor operation tasks to similar enterprises
answer :C
analysis : The activities that the general contractor contracts out the professional works or labor services in the contracted projects to other contractors for completion are called subcontracting . Professional engineering subcontracting , It refers to the activities that the general contractor contracts the professional works of the contracted projects to other contractors with corresponding qualifications . Labor subcontracting , It refers to the activities that the general contractor or professional subcontractor subcontracts the labor operation in the contracted project to the labor subcontracting enterprise .
20. according to 《 Text of construction contract for construction project 》 The general terms and conditions stipulate that , The experience of concealed works shall meet the requirements of standard specifications and design drawings , However, the supervising engineer shall not sign on the acceptance record after acceptance , In the following ( Condition , The construction unit can continue to conceal .
A. Confirmed in writing by the employer
B. The supervisor orally informed
C. Confirmed by the construction project leader
D. after 24 Hours
answer :D
analysis : The supervising engineer shall not sign on the acceptance record after acceptance , after 24 Hours , The construction unit can continue to conceal .
21.() Is within a certain range , Simplification and standardization are right ( Things or concepts ) Number of types , In a reasonable amount 、 Type is a standardized form and principle to meet general needs within a given time and space .
A. simplify
B. Unified
C. Coordinate
D. Optimize
answer :A
analysis : Simplification is within a certain range , Streamline standardized objects ( Things or concepts ) Number of types , In a reasonable amount 、 Type is a standardized form and principle to meet general needs within a given time and space .
边栏推荐
- Highcharts sets the histogram width, gradient, fillet, and data above the column
- Common - name of conference room
- SISO decoder for repetition (supplementary Chapter 4)
- Pstack and dmesg
- 3D建模有什么技巧吗?
- 【求助】請問如何讓微信公眾號文章在外部瀏覽器中打開後還能顯示下方的精選留言?
- 管理者必须知道的三个常识
- AHB2APB_ Bridge design
- Longest strictly increasing subsequence
- Unsupervised image classification code analysis notes of scan:learning to classify images without (1): simclr
猜你喜欢

APB2standard_handshake_bridge 设计

基于飞桨搭建的多模态学习工具包PaddleMM

2022各大厂最新总结的软件测试宝典,看完不怕拿不到offer
【求助】请问如何让微信公众号文章在外部浏览器中打开后还能显示下方的精选留言?

2022 the latest software testing classic summarized by major manufacturers. After reading it, I'm not afraid I won't get an offer

RTL arbiter design

iMeta | 南科大夏雨组纳米孔测序揭示微生物可减轻高海拔冻土温室气体排放

Anaconda安装、Jupyter Notebook默认启动路径修改及Nbextensions插件安装

highcharts设置柱状图宽度、渐变、圆角、柱子上方数据

Review of software testing technology
随机推荐
CMU 15-445 数据库课程第五课文字版 - 缓冲池
谷歌提出超强预训练模型CoCa,在ImageNet上微调Top-1准确率达91%!在多个下游任务上SOTA!...
APB2standard_ handshake_ Bridge design
3D建模有什么技巧吗?
Merge multiple binary search trees
构建Web应用程序
激活函数公式、导数、图像笔记
[assembly] analysis of Experiment 7 of the fourth edition of assembly language
【求助】請問如何讓微信公眾號文章在外部瀏覽器中打開後還能顯示下方的精選留言?
Three common sense that managers must know
Postman configuration Chinese
iMeta | 南科大夏雨组纳米孔测序揭示微生物可减轻高海拔冻土温室气体排放
Chrome tips - browser web page setting coding, solving the problem of web page garbled code, obtaining the latest version of charset plug-in, UTF-8 coding setting
Big work and requirements of economics in autumn 21 of Dagong [standard answer]
Experiment report of basic mechanical experiment (II) of School of distance and continuing education, Dalian University of technology [standard answer]
【C语言刷题——Leetcode10道简单题】
干货丨MapReduce的工作流程是怎样的?
Off line operation of situation and policy (version) of Dayong in autumn 21 [standard answer]
Summary 111111111111111111111
WR | 西湖大学鞠峰组微纳塑料污染对人工湿地菌群与脱氮功能的影响