当前位置:网站首页>What are the steps for how to develop a mall system APP?
What are the steps for how to develop a mall system APP?
2022-08-04 04:45:00 【Mengji Network】
In today's era of mobile shopping malls, the development of an enterprise is no longer just a website. The ability to acquire traffic is also the key to an enterprise's online e-commerce marketing. How to obtain traffic? It needs to be customized.An exclusive mall APP occupies each traffic entrance, so what process does the development of a mobile mall APP go through? The following editor will tell you:
The mall APP development process is as follows:
The first step: Mall APP development plan
The development of a mobile mall APP project must first formulate the overall plan, including the project development plan and general framework, that is to say, first determine the development of the mall APP product prototype, enter the project evaluation stage, and after repeated confirmation, finally form a productBrain map and complete requirements documentation.This requires research into the following areas:
1. User positioning: Mall APP development requires precise user positioning, and this positioning also determines the main style of this APP and what kind of user experience it brings.This needs to determine the group of people for which the enterprise develops the APP mall.
2. Value analysis: The development of an APP mall that is favored by users can help users solve problems. Therefore, developers should think more from the user's point of view in the process of making mall APP development.You can't just shrink in your own thinking world to design APP software.
3. Relevant design: Whether a newly developed mall APP will arouse the interest of users, we must first start from the design.Simple and beautiful APP design can make users' eyes shine and attract users' attention. Simple and convenient operation is the key factor to bring good experience to users and become loyal users of your APP store.
Step 2: Mall APP development function
This step of demand analysis is mainly to determine the main user groups and function realization of the mobile phone mall APP development, including the conception and design of the general interface of the APP, the code writing UI of large function modules, the beginning of UE design and the formation of preliminary renderings, etc.After confirmation, the renderings of the interface are formally designed. After the design of the product is completed, it will enter the research and development stage, and a formal program will be formed through the programming language.So far, the APP development process has completed a large part.
Step 3: Repeatedly test and modify the app
After the general interface and functions of the mobile mall APP are designed, the general version of the APP will come out. After trying and experiencing it several times, modify it according to the actual situation. After there are no major errors, the new version can try to find beta users. According toTest user feedback, improve and test iteratively.
Note: The user's opinions must be taken into account in the user testing phase of the mall APP development. Not every opinion will be adopted, but don't let go of any flaws and try your best to make your APP better.
Step 4: App marketing promotion
After many tests, the mobile phone mall APP can be put into the market after the development is completed, and marketing is a more critical part.Get more downloads and attract more users.
边栏推荐
- 7-2 LVS+DR概述与部署
- Stop behind.
- See how DevExpress enriches chart styles and how it empowers fund companies to innovate their business
- 看DevExpress丰富图表样式,如何为基金公司业务创新赋能
- 深度学习21天——卷积神经网络(CNN):实现mnist手写数字识别(第1天)
- [21 Days Learning Challenge] Image rotation problem (two-dimensional array)
- 深度学习21天——准备(环境配置)
- Use serve to build a local server
- There is an 8 hour difference between the docker installation of mysql and the host.
- Metaverse "Drummer" Unity: Crazy expansion, suspense still exists
猜你喜欢

系统设计.秒杀系统

JVM Notes

Take care of JVM performance optimization (own note version)

This Thursday evening at 19:00, the fourth live broadcast of knowledge empowerment丨The realization of equipment control of OpenHarmony smart home project

Significant differences between Oracle and Postgresql in PLSQL transaction rollback

SVM介绍以及实战

There is an 8 hour difference between the docker installation of mysql and the host.

Turn: Management is the love of possibility, and managers must have the courage to break into the unknown

System design. How to design a spike system (full version transfer)

docker安装mysql与宿主机相差8小时的问题。
随机推荐
JVM笔记
Mini program + e-commerce, fun new retail
Towards Real-Time Multi-Object Tracking(JDE)
2022 Hangzhou Electric Power Multi-School League Game 5 Solution
[21 Days Learning Challenge] Image rotation problem (two-dimensional array)
技术解析|如何将 Pulsar 数据快速且无缝接入 Apache Doris
某母婴小程序加密参数解密
mysql index notes
中信证券网上开户怎么开的?安全吗?
文件内容的操作
There is an 8 hour difference between the docker installation of mysql and the host.
Introduction and application of go module
杭电多校-Slipper-(树图转化+虚点建图)
PL/SQL Some Advanced Fundamental
帮助企业实现数字化转型成功的八项指导原则
C专家编程 第5章 对链接的思考 5.1 函数库、链接和载入
Shell 函数
深度学习环境配置
【技巧】借助Sentinel实现请求的优先处理
See how DevExpress enriches chart styles and how it empowers fund companies to innovate their business