当前位置:网站首页>Leakage relay jd1-100
Leakage relay jd1-100
2022-07-07 05:26:00 【Comprehensive operation of Shanghai Joseph Electric Appliance C】
brand :JOSEF Joseph
The product name : Leakage relay
Product model :JD1-100
Working voltage :AC220V/AC380V
Action time :0.1~2S
Installation mode : Guide rail in cabinet / Embedded panel
Zero sequence aperture :25mm~220mm
Host size :883660mm
Series models
JD1-100 Leakage relay
JD1-200 Leakage relay
JD1-250 Leakage relay
Leakage relay JD1-100
JD1 Series leakage relays were originally split and fixed , In order to meet the needs of current installation occasions , Shanghai Joseph relay factory in the original product JD1 Product upgrading based on integrated leakage relay , The development appears in the more popular separate guide rail installation JD1 Leakage relay , It is widely used in coal mines and other places , It is also a coal mine leakage relay ;
One 、 Product overview
Integrated leakage relay ( Hereinafter referred to as relay ) Suitable for AC voltage to 660V Or higher TN、TT、 and IT System , The frequency is 50Hz. Detect the zero sequence current exceeding the setting value through the zero sequence current transformer ( The remaining ) Leakage current . The relay is connected with the circuit breaker of shunt release or voltage loss release 、 AC contactor 、 Magnetic starter and other components of leakage protection device , For leakage and electric shock protection , Can be equipped with buzzer 、 Signal and other acoustooptic devices are combined to form a leakage alarm device . Derive multiple models , Prefix such as HLJ、RLJ、ULJ Series and other models , It is actually a similar product . It plays a very important role in the power system , It is the basis to ensure the reliability of power supply .
Leakage relay JD1-100
Two 、 Product use
The leakage protection relay has small volume 、 Easy to install and use 、 Reliable movement 、 Continuous power supply is stable and easy to operate . Can adapt to users everywhere , It can be used to protect the line from ground fault , It is mainly used to prevent equipment accident or electrical fire caused by grounding fault current , It can also be used to provide indirect contact protection for the release of human electric shock .
The leakage relay can be connected with the circuit breaker with shunt release or voltage loss release 、 AC contactor 、 Magnetic starter and other components of leakage protection device , For leakage and electric shock protection , It can also be equipped with buzzer 、 Signal lamp and other acousto-optic devices are combined to form a leakage alarm device . With reset 、 instructions 、 Call the police 、 Reset and other functions .
It is not suitable for the central grounding point of power supply or direct grounding system 、 Low voltage distribution system . It is a new product of network reform for safe use . The action time of the relay is divided into fast type and delay type , When used together, the trunk line and branch line shall be protected by classification , It can completely replace the past LLJ-□F(S)、LLJ-□H(S)、JD1 And JD3 Series leakage relay .
3、 ... and 、 Product parameters
● Rating
Voltage rating : Rated voltage AC380V、AC660V、AC690V、AC1140V.
Working voltage value :DC24V、AC110V、AC127V、AC220V、AC380V. It can also be customized according to customer requirements .
Allowable variation range of power supply voltage : The voltage variation is the rated voltage 0.7 to 1.3 Times or wide power circuit .
Rated current value :16A、25A、32A、40A、63A、80A、100A、125A、200A、250A、320A、400A、630A、800A、1000A、1500A、1600A、2000A. Non standard point current can also be customized .
The relay is an electronic current operated leakage relay , It is mainly composed of zero sequence current transformer 、 Electronic circuits 、 The working principle of the test circuit and outlet relay is as follows : The wiring is shown in the figure (1), Zero sequence transformer passing through the main line , When there is no leakage in the main line , The sum of vectors is equal to zero or minimal , When there is leakage or electric shock on the main line , The zero sequence transformer senses an unbalanced current vector and signal , When the circuit of zero sequence current transformer leaks to the ground iA+iB+iC≠0. Send it to the host for amplification , Check whether the leakage current exceeds the setting value , And send the results to the actuator for execution . At this time, the zero sequence current transformer will generate an induction signal , This signal is processed by electronic circuit , When the leakage current reaches the action value , Make the thyristor contact and make the relay act , Use relay normally open 、 The closing point controls the disconnection of the main circuit breaker or contactor , Cut off the fault line to achieve the purpose of protection . The test circuit is composed of resistors, buttons and other components , Press the test button , There is a current flowing through the transformer , Equivalent to the leakage current of the main line , The indicator light is on , The outlet relay should be able to act . Press the reset button , The light goes out , Outlet relay returns .
1. Prevent electric shock accidents caused by leakage of electrical equipment and electrical lines ;
2. Prevent single-phase electric shock accidents during power use ;
3. Timely cut off the single-phase grounding electric shock fault in the operation of electrical equipment , Prevent fire accidents caused by electric leakage .
Shanghai Joseph relay business department
边栏推荐
- Longest non descent subsequence (LIS) (dynamic programming)
- NPDP产品经理认证,到底是何方神圣?
- np. random. Shuffle and np Use swapaxis or transfer with caution
- Two methods of thread synchronization
- Wonderful express | Tencent cloud database June issue
- TabLayout修改自定义的Tab标题不生效问题
- Knapsack problem unrelated to profit (depth first search)
- qt 简单布局 盒子模型 加弹簧
- 【QT】自定义控件-Loading
- 10 distributed databases that take you to the galaxy
猜你喜欢
Lombok插件
Longest palindrome substring (dynamic programming)
JVM(十九) -- 字节码与类的加载(四) -- 再谈类的加载器
利用OPNET进行网络指定源组播(SSM)仿真的设计、配置及注意点
【js组件】date日期显示。
Under the trend of Micah, orebo and apple homekit, how does zhiting stand out?
SQL injection cookie injection
一条 update 语句的生命经历
y58.第三章 Kubernetes从入门到精通 -- 持续集成与部署(三一)
Harmonyos fourth training
随机推荐
Record a pressure measurement experience summary
LabVIEW is opening a new reference, indicating that the memory is full
Scheduledexecutorservice timer
When deleting a file, the prompt "the length of the source file name is greater than the length supported by the system" cannot be deleted. Solution
JHOK-ZBG2漏电继电器
[optimal web page width and its implementation] [recommended collection "
c语言神经网络基本代码大全及其含义
背包问题(01背包,完全背包,动态规划)
Harmonyos fourth training
DBSync新增对MongoDB、ES的支持
TabLayout修改自定义的Tab标题不生效问题
K6EL-100漏电继电器
[Oracle] simple date and time formatting and sorting problem
高压漏电继电器BLD-20
App clear data source code tracking
JVM (XX) -- performance monitoring and tuning (I) -- Overview
QT simple layout box model with spring
K6el-100 leakage relay
【oracle】简单的日期时间的格式化与排序问题
Knapsack problem unrelated to profit (depth first search)