Project cost management__ Cost management technology__ Article 6 prediction
2022-07-03 09:42:00 【ximanni18】
Techniques and tools for project cost management Include :
- Cost analysis technology
- Cost management technology
This paper introduces the cost management technology The first 6 spot
6. forecast
As the project progresses , In the project team, according to the project performance , Estimate of completion (EAC) To make predictions , The predicted results may be consistent with the completion budget (BAC) Differences exist . If BAC Obviously no longer feasible , Then the project manager shall consider EAC To make predictions . forecast EAC Based on current performance information and other knowledge , Predict the future situation and events of the project . The forecast shall be generated according to the work performance data provided during project implementation 、 Update and republish . Job performance information includes the past performance of the project , And any information that may have an impact on the project in the future .

In the calculation EAC when , Usually the actual cost of the work done , Add the remaining work The completion of the project needs to be estimated (ETC).
The bottom-up aggregation method manually carried out by the project manager and the project team , Is one of the most common EAC Prediction method .
The formula : EAC= AC+ Bottom up ETC. namely Completion estimate = actual cost + The bottom-up completion needs to be estimated .
~~~~~~~~~~~~~~~~~~~~~~~~~
Calculation EAC ( Completion estimate ) There are three most commonly used methods :
1 It is assumed that... Will be completed at the budgeted unit price ETC Work . This approach recognizes the cumulative actual project performance expressed in realized costs , And predict all the future ETC All work Will be completed at the budgeted unit price .
The formula : EAC=AC+(BAC-EV).
2. Assume that at present CPI complete ETC Work . This approach assumes that the project will continue as it has been so far , namely ETC The work will be based on the cumulative cost performance index of the project to date (CPI) The implementation of .
The formula : EAC= BAC/CPI
CPI: Cost performance index , CPI = EV / AC.
3. hypothesis SPI And CPI Will also affect ETC Work . In this prediction , It is necessary to calculate an efficiency index determined by cost performance index and schedule performance index , And suppose ETC The work will be completed according to the efficiency index . If the project schedule is right ETC Have an important influence . This method is the most effective . When using this method , It can also be judged by the project manager , Give to separately CPI and SPI Give different weights , Such as
80/20, 50/50 etc. .
The formula : EAC = AC+[(BAC-EV) / (CPI x SPI )].
If predicted EAC The value is not within the acceptable range , Is to send an early warning signal to the project management team .
边栏推荐
- Flink learning notes (10) Flink fault tolerance mechanism
- 【順利畢業】[1]-遊覽 [學生管理信息系統]
- PolyWorks script development learning notes (II) -treeview basic operations
- Solve editor MD uploads pictures and cannot get the picture address
- [graduation successful] [1] - tour [Student Management Information System]
- Vscode Arduino installation Library
- Implementing distributed lock with redis
- The rise and fall of mobile phones in my perspective these 10 years
- MYSQL数据库底层基础专栏
- Jetson Nano 自定义启动图标kernel Logo cboot logo
猜你喜欢

Code word in NR

Spark overview

数字身份验证服务商ADVANCE.AI顺利加入深跨协 推进跨境电商行业可持续性发展

UCI and data multiplexing are transmitted on Pusch (Part V) -- polar coding

The cyclic shift of PUCCH in NR channel is generated by MATLAB

Nr--- Pusch I: sorting out the agreement process

PolyWorks script development learning notes (III) -treeview advanced operation

Development of fire power monitoring system

Nodemcu-esp8266 development (vscode+platformio+arduino framework): Part 3 --blinker_ MIOT_ Light (lighting technology app control + Xiaoai classmate control)

PolyWorks script development learning notes (4) - data import and alignment using file import
随机推荐
Nodemcu-esp8266 development (vscode+platformio+arduino framework): Part 2 --blinker_ Hello_ WiFi (lighting technology - Mobile App control routine)
Nodemcu-esp8266 development (vscode+platformio+arduino framework): Part 5 --blinker_ MIOT_ MULTI_ Outside (lighting technology app + Xiaoai classmate control socket multiple jacks)
LeetCode每日一题(985. Sum of Even Numbers After Queries)
Vscode Arduino installation Library
LeetCode每日一题(2232. Minimize Result by Adding Parentheses to Expression)
1922. Count Good Numbers
[CSDN] C1 training problem analysis_ Part II_ Web Foundation
Leetcode daily question (2232. minimize result by addressing parents to expression)
Flink learning notes (IX) status programming
LeetCode每日一题(1996. The Number of Weak Characters in the Game)
2021-09-26
Arduino handles JSON data, arduinojson assistant
解决Editor.md上传图片获取不到图片地址问题
从0开始使用pnpm构建一个Monorepo方式管理的demo
Qt QComboBox QSS样式设置
Leetcode daily question (2109. adding spaces to a string)
Leetcode daily question (2090. K radius subarray averages)
UCI and data multiplexing are transmitted on Pusch - Part I
Long类型的相等判断
Nodemcu-esp8266 development board to build Arduino ide development environment