当前位置:网站首页>618, you may be able to wake up a little bit
618, you may be able to wake up a little bit
2022-08-05 06:15:00 【LinkSLA】
Whenever there is a festival, there must be marketing.Where there is marketing, traffic will increase.
Every e-commerce node, the most nervous thing is not the store listing, nor the netizens who are watching the spike, but the behind-the-scenes operation and maintenance of online shopping.What they worry about most: network outages, application freezes, slow response times, server downtime...
Therefore, operation and maintenance personnel need to prepare multiple sets of preparatory plans early, and repeatedly test and simulate drills.....
Once upon a time, aIt is normal for the server to go down due to the spike in the field. Now, with hundreds of thousands of orders per second, the server is still strong.
There is no doubt that this is the advancement of technology and the maturity of operation and maintenance.
1, Capacity planning. Do stress testing in the production environment. Only after experiencing stress testing will you have a bottom line.
Key applications should support current limiting.The instant kill on the hour is likely to exceed expectations. Only by setting the current limit can protect your own application, otherwise an avalanche chain reaction is likely to occur.
2. Downgrade non-core functions.In the application of core transactions, the degradation of non-core functions is acceptable to a certain extent.
3. Emergency plan.Prepare in advance for unusual situations that may occur.
Current operation and maintenance personnel basically do not need to pay attention to the underlying facilities such as the computer room, network, and operating system.
Through full-stack monitoring, the global operation and maintenance platform can be observed, distributed data to achieve load balancing, and avoid crashes in the early morning with high concurrency.
Operation and maintenance personnel will shift more energy to rapid launch and rapid iteration to support business development.
For operation and maintenance, how to find problems in time? Can they locate them in time? How to monitor network conditions in real time?How is the acceleration effect?......
In response to this series of problems, LinkSLA can detect problems in time through real-time measurement and control, relieve many troubles of operation and maintenance personnel, from physical environment, infrastructure,All-round, visualized, full-stack inspection monitoring and data collection are carried out at multiple levels such as application business, and machine learning algorithms are used to realize early warning and correlation, accurately locate problems, predict faults in advance, and enjoy worry-free operation and maintenance.
边栏推荐
- ALC实验
- Hugo builds a personal blog
- IP address and subnet division
- The problem of redirecting to the home page when visiting a new page in dsf5.0
- Getting Started Doc 08 Conditional Plugins
- ROS video tutorial
- IP地址及子网的划分
- Small example of regular expression--remove spaces in the middle and on both sides of the string
- IJCAI 2022|Boundary-Guided Camouflage Object Detection Model BGNet
- spark source code - task submission process - 1-sparkSubmit
猜你喜欢
【Day1】VMware软件安装
实力卷王LinkSLA,实现运维工程师快乐摸鱼
[Day1] (Super detailed steps) Build a soft RAID disk array
Network wiring and digital-to-system conversion
入门文档12 webserve + 热更新
账号与权限管理
Introductory document 05-2 use return instructions the current task has been completed
The problem of calling ds18b20 through a single bus
Getting Started Document 09 Standalone watch
spark source code - task submission process - 1-sparkSubmit
随机推荐
入门文档04 一个任务依赖另外一个任务时,需要按顺序执行
【Day8】(超详细步骤)使用LVM扩容
[Day8] Commands involved in using LVM to expand
IJCAI 2022|Boundary-Guided Camouflage Object Detection Model BGNet
【Day8】RAID Disk Array
【Day8】使用LVM扩容所涉及的命令
Wechat applet page jump to pass parameters
The problem of calling ds18b20 through a single bus
The problem of redirecting to the home page when visiting a new page in dsf5.0
LeetCode面试题
NIO工作方式浅析
I/O performance and reliability
OpenCV3.0 is compatible with VS2010 and VS2013
spark源码-RPC通信机制
[Day1] VMware software installation
入门文档07 分阶段输出
NAT实验
Getting Started Document 07 Staged Output
RAID磁盘阵列
Dsf5.0 bounced points determine not return a value