2022 Inner Mongolia latest construction tower crane (construction special operation) simulation examination question bank and answers
2022-07-06 08:18:00 【100% question bank】
The 100% question bank provides Special workers ( Tower crane ) Examination questions 、 Special workers ( Tower crane ) Test prediction questions 、 Special workers ( Tower crane ) The real exam question 、 Special workers ( Tower crane ) Certificate examination question bank, etc , Provide online questions and brush questions , Online mock exam , Help you pass the exam easily .
123 The lifting height limiter of tower crane with luffing boom , It should also be able to cut off the power supply of the outward luffing control circuit at the same time , But there should be downward and inward luffing movement .
answer : correct
124 The two-way luffing of the tower crane with trolley luffing shall be equipped with rope breaking protection device and shaft breaking protection device , And the action should be sensitive 、 It works .
answer : correct
125 The tower crane does not have a collector ring for the rotating part , Rotation limiter should be set , The left and right rotation should be controlled at 1.5 circle .
answer : error
126 Amplitude refers to the horizontal distance from the slewing center line of the tower crane to the vertical line of the hook Center , It is usually called turning radius or working radius .
answer : correct
127 Tower cranes can only be used as vertical transportation equipment .
answer : correct
128 Terminal to prevent the tower crane from running out of the track , Amplitude limiter is often used to limit .
answer : error
129 The size of the fixed foundation shall meet the stability requirements of the tower crane in working and non working states and the requirements of the foundation bearing capacity .
answer : correct
130 The foundation of tower crane shall be designed and constructed according to the requirements specified in the current national standards and operation instructions .
answer : correct
131 During the jacking process of tower crane , Ensure that the jib of the tower crane is in a balanced state .
answer : correct
132 When adding section to tower crane , The attachment device should be installed after 、 Start by jacking up and adding sections .
answer : error
133 When disassembling the jack up tower crane, the attachment device should be removed first 、 Fall back .
answer : correct
134 The installation and disassembly of tower crane reach a height 1m And more than , Personnel working at heights shall wear safety helmets correctly according to regulations 、 Safety belts and other labor protection articles .
answer : error
135 During tower crane operation , Bolts and shaft pins can be loosened by rotating the boom .
answer : error
136 The influence of surrounding obstacles on the operation of the tower crane and the operation of the tower crane on the surrounding shall be fully considered in the installation and site selection of the tower crane .
answer : correct
137 Tower crane installation and disassembly , The command signal must be sent by the commander , Other personnel shall not command .
answer : correct
138 The installation sequence from tower crane underframe to slewing mechanism is generally : chassis → Basic section → Standard section → Set the frame → Upper support of slewing mechanism 、 walking board 、 cab 、 Slewing ring and lower support → Slewing tower
answer : correct
139 The installation sequence from the top of the tower crane to the counterweight is generally : top of a tower → Balance arm and balance arm pull rod → Partial counterweight ( Usually one or two pieces )→ Wire connection → Boom and boom tie rod → Other counterweights
answer : correct
140 The installation sequence of tower crane threading and winding steel wire rope to complete machine test is generally : Threading and winding steel wire rope → Safety device adjustment → Jacking and jointing → Diagonal bracing → Jacking and jointing → Attach frame → Performance test and acceptance of the whole machine
answer : correct
141 The lifting process of tower crane is not complicated , But we must be serious 、 careful , Everyone should have a clear division of labor , Attend to each one's own duties .
answer : correct
142 The clearance between the guide wheel of the climbing roller carrier and the main chord of the tower body shall be adjusted to 2~3mm, Loosen the cable length , Make it slightly larger than the total climb height .
answer : correct
143 During the test of trolley luffing tower crane, it is between the maximum amplitude and the minimum amplitude , The trolley changes amplitude in two directions at the rated speed .
answer : correct
144 The installation unit of tower crane shall conduct self inspection on the installation quality , And entrust a qualified inspection and testing institution to carry out the inspection .
answer : correct
145 The self inspection report and inspection report of the installation quality of the building tower crane shall be stored in the equipment archives .
answer : correct
146 During the installation of tower crane , The installation unit shall conduct self inspection and acceptance in stages .
answer : correct
147 Construction tower crane installation and disassembly workers refer to those engaged in fixed construction at the construction site of construction projects 、 Installation of rail and internal climbing tower cranes 、 Attachment 、 Jacking and dismantling operations .
answer : correct
148 The safety rope for hoisting installation and disassembly refers to the steel wire rope used to ensure the stability of the installed components or equipment during operation , The upper end is tied with the installation object , The lower end is fixed with the ground anchor .
answer : error
149 Lifting appliances refer to the machines, tools and accessories that fasten and fix the lifting ropes , Like a sling 、 A hook 、 Lifting beam and snap ring, etc .
answer : correct
150 Slip rope refers to the general term of ropes used to prevent falling accidents of lifting personnel when working at heights .
answer : correct
151 The wind rope of lifting cable refers to the rope tied to the lifted structure , Held by the person below , Prevent the structure from swinging arbitrarily during lifting .
answer : error
152 Under special circumstances, the tower crane can carry people .
answer : error
153 The lifting operation of tower crane should be carried out at night .
answer : error
154 When commanding the boom and hook at the same time , The commander must command the boom with his left hand , The right hand commands the hook .
answer : correct
155 Tower crane installers should be able to safely handle heavy objects , It does not include the physical strength of installing the tower crane .
answer : error
156 Non operators can climb on the operation platform of the tower crane lifting jacket to watch .
answer : error
157 Billboards or other placards can be attached to the tower of the tower crane .
answer : error
158 General gesture signal refers to the command gesture generally applicable to various types of cranes in hoisting .
answer : correct
159 Special hand signal refers to the special lifting 、 Luffing 、 The command gesture used separately by the crane of the slewing mechanism .
answer : correct
160 The hoisting sound signal is the auxiliary signal of gesture signal or semaphore , The user can determine whether to adopt .、 answer : correct
161 The color of the hoisting command flag is red 、 green . It should be non fading 、 Materials that are not prone to wrinkles .
answer : correct
162 The lifting commander should hold a red flag in his right hand , Hold a green flag in your left hand .
answer : error
163 When the lifting commander cannot see the driver and load at the same time , It is not allowed to add intermediate commanders to transmit signals step by step .
answer : error
164 The front of the lifting commander 、 after 、 Left 、 Right in command language , All are based on the position of the driver .
answer : correct
165 The hand signals used in lifting command are divided into , General gesture signal and special gesture signal .
answer : correct
166 The hoisting command signal is divided into , Hand signals 、 Semaphore signal 、 Sound signal 、 There are four kinds of language signals .
answer : correct
167 The lifting commander issued “ get set ” Signal time , Look at the object .
answer : error
168 When the lifting commander requires the lifting machinery to move slightly , Available on demand , Repeat the signal .
answer : correct
169 Used by the hoisting commander “ Hoisting command language ” Command time , Speak local languages .
answer : error
170 When multiple people are tied to the same object , Before lifting , You should make a call response first , After confirming that the binding is correct , Can be commanded by more than one person .
answer : error
171 The arms of the lifting commander are straight , Put it over your head , Five fingers stretch out naturally , Keep your palms forward , Refer to “ get set ” Pay attention to the lifting signal
answer : correct
边栏推荐
- 使用 TiUP 升级 TiDB
- Nft智能合约发行,盲盒,公开发售技术实战--拼图篇
- All the ArrayList knowledge you want to know is here
- Tidb backup and recovery introduction
- Golang DNS 随便写写
- Make learning pointer easier (3)
- [research materials] 2022 enterprise wechat Ecosystem Research Report - Download attached
- 将 NFT 设置为 ENS 个人资料头像的分步指南
- The ECU of 21 Audi q5l 45tfsi brushes is upgraded to master special adjustment, and the horsepower is safely and stably increased to 305 horsepower
- Restore backup data on S3 compatible storage with br
猜你喜欢
[secretly kill little partner pytorch20 days -day01- example of structured data modeling process]
Nacos Development Manual
IP lab, the first weekly recheck
National economic information center "APEC industry +": economic data released at the night of the Spring Festival | observation of stable strategy industry fund
22. Empty the table
NFT smart contract release, blind box, public offering technology practice -- jigsaw puzzle
Leetcode question brushing record | 203_ Remove linked list elements
Sanzi chess (C language)
"Designer universe" Guangdong responds to the opinions of the national development and Reform Commission. Primary school students incarnate as small community designers | national economic and Informa
Asia Pacific Financial Media | female pattern ladyvision: forced the hotel to upgrade security. The drunk woman died in the guest room, and the hotel was sentenced not to pay compensation | APEC secur
随机推荐
Parameter self-tuning of relay feedback PID controller
Restore backup data on S3 compatible storage with br
The Vice Minister of the Ministry of industry and information technology of "APEC industry +" of the national economic and information technology center led a team to Sichuan to investigate the operat
Mex related learning
649. Dota2 Senate
Introduction to number theory (greatest common divisor, prime sieve, inverse element)
CAD ARX gets the current viewport settings
IoT -- 解读物联网四层架构
Secure captcha (unsafe verification code) of DVWA range
Data governance: Data Governance under microservice architecture
Online yaml to CSV tool
The resources of underground pipe holes are tight, and the air blowing micro cable is not fragrant?
使用 BR 恢复 S3 兼容存储上的备份数据
CAD ARX 获取当前的视口设置
National economic information center "APEC industry +": economic data released at the night of the Spring Festival | observation of stable strategy industry fund
P3047 [usaco12feb]nearby cows g (tree DP)
String to leading 0
hcip--mpls
从 CSV 文件迁移数据到 TiDB
1204 character deletion operation (2)