[punch in questions] integrated daily 5-question sharing (phase III)

2022-07-05 03:38:00 weixin_ forty-six million six hundred and nineteen thousand two

01 、( ) Extend quality control to the whole process of product life cycle .

A. Inspection Technology

C. Sampling inspection method

B. Statistical quality control

D. Total quality management

02 、( ) It refers to the purposeful activities to ensure that the future performance of the project is in line with the project management plan .

A. Corrective actions

C. Defect remedy

B. Preventive measures

D. Functional perfection

03 、 The contractor of a project estimates that the project has 0.5 The probability of profit 200000 dollar ,0.3 The probability of loss 50000 dollar , also 0.2 The probability of maintaining a balance , The expected monetary value of the project is ( ) dollar .

A.200000

C.50000

B.85000

D.180000

04 、 stay OSI In the seven layer protocol ,( ) Mainly responsible for ensuring data reliability 、 The order 、 From A Point to point transmission to B spot .

A. Data link layer

C. Transport layer

B. The network layer

D. The session layer

05 、 The formation of project team needs to experience 5 Stages , After a period of running in , Team members are familiar with each other , The stage where the team contradiction has been basically solved is ( ).

A. The formative stage

C. Concussion stage

B. Play stage

D. The specification phase