当前位置:网站首页>2022 high altitude installation, maintenance and demolition examination materials and high altitude installation, maintenance and demolition operation certificate examination

2022 high altitude installation, maintenance and demolition examination materials and high altitude installation, maintenance and demolition operation certificate examination

2022-07-08 01:21:00 Queen 219

Source of question bank : Safety production simulation test, a little public official account.

Pass the safety production simulation exam at one point : High installation 、 maintain 、 The demolition examination data is generated by the one-point pass of the safety production simulation examination , High installation 、 maintain 、 The removal of the certificate simulation examination question bank is based on the installation at high altitude 、 maintain 、 Dismantle the latest edition of teaching materials and compile the high-altitude installation 、 maintain 、 Remove the simulation test .2022 Annual high-altitude installation 、 maintain 、 Remove the examination materials and high-altitude installation 、 maintain 、 Demolition operation certificate examination

1、【 Single topic selection 】 Safety self-locking device ( Including supporting cables ) Inspection items of , The standard cycle is ().(  A  )

A、6 month

B、3 month

C、1 year

2、【 Single topic selection 】 A control distribution box is installed in the fire pump room , The height from the bottom of the control box to the operating platform is ()m.(  C  )

A、1.8

B、1.2

C、0.8

3、【 Single topic selection 】 Relay protection and automatic devices are ().(  C  )

A、 Primary equipment

B、 Measuring equipment

C、 Secondary equipment

4、【 Single topic selection 】 Employees () Deal with emergencies , You can stop working at heights .(  A  )

A、 Entitled

B、 Have no right

C、 Not allowed to

5、【 Single topic selection 】 Large construction area, Underground Multi-storey construction 、 Temporary facilities with complex construction environment , A single lighting plan shall be prepared () programme .(  A  )

A、 electricity

B、 fire

C、 Flame retardant

6、【 Single topic selection 】 For large “ door ” Zigzag crane , In the process of dismantling the crane, workers must first ().(  A  )

A、 Keep the crane mechanism balanced

B、 Remove the column first

C、 First remove the driving building and other accessories on the crane beam

7、【 Single topic selection 】 Condensate flows naturally by level difference , Therefore, the condensate pipe shall not appear () The phenomenon of .(  A  )

A、 Back bend

B、 Round the corner

C、 Horizontal installation

8、【 Single topic selection 】 The structural framework of the square stage is often used ().(  B  )

A、 Metal truss

B、 The scaffold

C、 Metal tennis rack

9、【 Single topic selection 】() The elevator shaft door shall be shaped 、 Design and manufacture according to the requirements of instrumentalization , Its height should be within 15~18m Within the scope of . No more than... In the elevator shaft 10m A safety flat net shall be set .(  A  )

A、 Construction unit

B、 Elevator manufacturer

C、 Design unit

10、【 Single topic selection 】 After the chemical anchor bolt is put into the medicine, the anchor bolt is implanted and screwed in with an electric drill ,() This method is correct .(  C  )

A、 Screw in at high speed

B、 Screw in slowly

C、 Medium speed screw in

11、【 Single topic selection 】 “ Liquid hammer ” It's adding... Refrigerant () A phenomenon that occurs only when the situation is .(  C  )

A、 appropriate

B、 Less

C、 many

12、【 Single topic selection 】 The wire rope of the speed differential () There is severe squashing .(  B  )

A、 allow

B、 must not

C、 appropriate

13、【 Single topic selection 】 The calculation of the total load of landing advertising facilities has nothing to do with which of the following factors ().(  C  )

A、 Advertising facilities

B、 Wind load

C、 Advertising forms

14、【 Single topic selection 】 All preparations shall be made before erecting the pole , from () Conduct a comprehensive inspection , Do not proceed until it is confirmed to be safe .(  A  )

A、 Person in charge of the construction site

B、 Technical director

C、 High altitude workers

15、【 Single topic selection 】 During knife switch operation , You should bring () glove .(  A  )

A、 insulation

B、 Ordinary

C、 pure cotton

16、【 Single topic selection 】 The top of the tower is lifted from the ground about ()m when , The crane shall be stopped for impact test .(  C  )

A、1.2

B、1

C、0.8

17、【 Single topic selection 】 Prompt signs include : From top to bottom 、() etc. .(  A  )

A、 Work here

B、 No Burning

C、 Be careful of slippery

18、【 Single topic selection 】 Insulating boots and gloves can () High pressure injury .(  A  )

A、 Refuse

B、、 Reduce

C、、 Eradicate

19、【 Single topic selection 】 When climbing with a ladder , The foot of the ladder must be done () measures .(  A  )

A、 Non-slip

B、 Windbreak

C、 waterproof

20、【 Single topic selection 】 Inspection items of speed difference automatic controller , The standard cycle is () year .(  B  )

A、 And a half

B、 One

C、 two

21、【 Single topic selection 】 Due to its special harmfulness, work at heights , In addition to implementing safety technical measures, relevant units , It should also be strengthened () Management work .(  A  )

A、 Security

B、 personnel

C、 The prevention of

22、【 Single topic selection 】 All operation equipment to be repaired , It should be hung with () sign .(  A  )

A、 No use

B、 To be repaired

C、 You can use

23、【 Single topic selection 】 New standards jointly issued by the National Standards Commission 《 Classification of major disasters 》 standard () Year of implementation .(  B  )

A、2008

B、2009

C、2010

24、【 Single topic selection 】 A neon light factory installed neon lights above the door of a hotel , No ignition device is set during welding operation . Cause welding slag to fall on the carpet in the lobby , No one found , Cause a fire . Wait for the workers to return to the scene after lunch , The lobby has burned down , Cause economic loss 40 More than ten thousand yuan . The direct cause of the accident is ().(  A  )

A、 No ignition device is set during welding

B、 Didn't inspect the site before finishing work

C、 The scene of the accident was unattended

25、【 Single topic selection 】 The continuous working time of the elevator of the electric hanging basket is less than ()min.(  C  )

A、20

B、40

C、30

26、【 Single topic selection 】 The demolished and demolished building area is greater than 1000㎡ Demolition works of , A safety plan shall be prepared ().(  A  )

A、 Construction organization design

B、 Technical disclosure

C、 Technical solution

27、【 Single topic selection 】 Working at heights , Like scaffolding , When removing large equipment , You have to use ().(  C  )

A、 Safety rope

B、 Protective net

C、 Safety belt

28、【 Single topic selection 】 The tower is () rod 、 The general name of reinforced concrete pole and tower .(  C  )

A、 single

B、 double

C、 wood

29、【 Single topic selection 】 All kinds of distribution boxes and switch boxes on the construction site must be determined () And maintenance responsible person .(  A  )

A、 Overhaul

B、 repair

C、 management

30、【 Single topic selection 】 Cutting equipment used in high place operation shall use () So as not to ignite combustible substances and cause fire .(  C  )

A、 Water storage bucket

B、 Fire basin

C、 Fire baffle

31、【 Single topic selection 】 The foot pedal interval of the hanging ladder shall be ()mm.(  A  )

A、300 to 400

B、200 to 300

C、400 to 500

32、【 Single topic selection 】 Buried laying is adopted from the distribution room to the main body of the structure , The burial depth is 0.7m. The cable is evenly laid up, down, left and right ()mm Fine sand , Cover it with red bricks , Backfill with fine soil .(  B  )

A、55

B、50

C、60

33、【 Single topic selection 】 The standard period of inspection items of safety fence is ().(  A  )

A、 Half a year

B、3 Months

C、 A year

34、【 Single topic selection 】 The general contractor must implement the management of () Supervision and management of power facilities and daily construction .(  B  )

A、 contract issuing unit

B、 Construction unit

C、 Construction unit

35、【 Single topic selection 】 When using insulating boots , Should be () Sleeve into the boot .(  B  )

A、 clothes

B、 bottom of a trouser leg

C、 shoes

36、【 Single topic selection 】 Construction operations in the area where inflammables and explosives are produced or stored belong to () Class I hot work area .(  A  )

A、 One

B、 Two

C、 3、 ... and

37、【 Single topic selection 】 Before the demolition of large sports facilities starts , According to the characteristics of the project 、 equipment 、 Facilities 、 Preparation of quantities, etc ().(  C  )

A、 Demolition budget

B、 Safety disclosure

C、 Special safety plan

38、【 Single topic selection 】 The contractor who undertakes the construction of large-scale mechanical equipment disassembly project must have the corresponding requirements for the disassembly and installation of special equipment (), Abide by national laws and regulations , Safe production .(  A  )

A、 Qualification, safety production knowledge and management ability

B、 Qualification management ability

C、 Safety production knowledge and management ability

39、【 Single topic selection 】 Safety net includes safety flat net and ().(  A  )

A、 Safety net

B、 A safety helmet

C、 Safety belt

40、【 Single topic selection 】 The special operation certificate has not been reexamined upon expiration , Special operation certificate ().(  A  )

A、 invalid

B、 Continue to use

C、 Can review

41、【 Single topic selection 】 When the main water supply pipe adopts copper pipe 、 Thermal compensation measures shall be taken for plastic pipes and main pipes of hot water system according to design requirements . Pre stretching must be done as required when installing the compensator . Wait for the pipeline () After installation , Remove the pre stretched support , Adjust the slope .(  A  )

A、 Fixing clip

B、 level

C、 Slide the clip

42、【 Single topic selection 】 In order to make the machine stop moving quickly , Sure ().(  A  )

A、 Use the control device

B、 power failure

C、 Use external force to stop

43、【 Single topic selection 】 Site metal structure ( Lighting rack, etc ) And various tall facilities must be installed according to regulations ().(  B  )

A、 Leakage device

B、 Lightning protection device

C、 Protector

44、【 Single topic selection 】 () Operators must be trained 、 Work with certificate after passing the examination .(  C  )

A、 Main types of work

B、 The construction of the

C、 Special jobs

45、【 Single topic selection 】 Pipe installation starts from () Start , According to the water flow direction, the prefabricated pipe section shall be transported to the corresponding position according to the number , In order .(  B  )

A、 Exhaust port

B、 Water inlet

C、 outlet

46、【 Single topic selection 】 Secure the safety device () Meet the environmental and process conditions of machine operation .(  C  )

A、 You can't

B、 passive

C、 Automatically

47、【 Single topic selection 】 If the safety net and protective rod are not set according to the regulations , Once the operator makes a mistake in behavior or operation , Because there is no protection or the protection is not in place () falling .(  B  )

A、 object

B、 High

C、 Roof top

48、【 Single topic selection 】 Each of the construction project department () Conduct at least one safety inspection .(  C  )

A、 Zhou

B、 season

C、 month

49、【 Single topic selection 】 The lighting of the building body mostly adopts LED product , To save energy , It is not advisable to use () form .(  B  )

A、 Net format

B、 Plane full auxiliary

C、 Line style

50、【 Single topic selection 】 () Safety self-locking device must be used for operation .(  B  )

A、 high altitude

B、 High tower

C、 High

51、【 Single topic selection 】 Open installation of riser , The riser of each floor and each trip shall be hung from top to bottom to install clamps , Highly consistent ; When installing the riser in the shaft, its clamp should be set () Card holder .(  B  )

A、 I-beam

B、 Section steel

C、 Angle steel

52、【 Single topic selection 】 When working on the top of the rod , The waist rope should be placed under the stay wire , Otherwise, the waist is at least lower than the top of the rod ()cm.(  A  )

A、50

B、30

C、80

53、【 Single topic selection 】 The formwork shall be provided with ropes and wooden bars () In the pit .(  C  )

A、 Throw in

B、 Hoist in

C、 Slide into

54、【 Single topic selection 】 The swing vane motor of the air conditioner is broken ().(  C  )

A、 Replace the motor immediately

B、 Can't continue to use

C、 Can continue to use

55、【 Single topic selection 】 Occupational disease prevention equipment 、 Emergency rescue equipment and personal protective equipment , The employer should () maintain 、 Overhaul , Make sure it is in normal condition .(  B  )

A、 Discretion

B、 regular

C、 by stages

56、【 Single topic selection 】 Fixed hanging ladders are sometimes set up in the construction of advertising facilities , Its height should not exceed ()m.(  B  )

A、4

B、6

C、8

57、【 Single topic selection 】 The qualification certificate for special operation of special operation personnel shall be stipulated by the competent construction Department of the State Council () The style of .(  A  )

A、 Unified

B、 Varied

C、 Various

58、【 Single topic selection 】 The safety factor of steel wire rope for electric hanging basket shall not be less than ().(  B  )

A、7

B、9

C、8

59、【 Single topic selection 】 The roof layer and structural layer are two parts ().(  C  )

A、 Stairs

B、 The wall

C、 roof

60、【 Judgment questions 】 The demolished objects shall be managed by special personnel , Spray water and clean regularly , Necessary watering facilities shall be provided 、 Drainage facilities .(  √  )

61、【 Judgment questions 】 Heavy snow when working at heights 、 The heavy rain 、 It is safe to continue construction in severe cold weather .(  ×  )

62、【 Judgment questions 】 The horizontal safety rope is the horizontal fixed safety rope .(  √  )

63、【 Judgment questions 】 For the installation of drainage riser in the shaft, its clamp should be set with profile steel clamp frame .(  √  )

64、【 Judgment questions 】 The supervisor of air conditioning installation shall not leave the operator for any reason .(  ×  )

65、【 Judgment questions 】 As long as the object is near the earth , Whether the object is in contact with the earth or not , Are affected by gravity .(  √  )

66、【 Judgment questions 】 Employees should “ Observe labor discipline and professional ethics ”.(  √  )

67、【 Judgment questions 】 There are many people working at heights , Big base , That is, the probability of casualties is small , The number of casualties is also high .(  √  )

68、【 Judgment questions 】 After removal, the muck removal vehicles shall be loaded according to the regulations , The tarpaulin is tight , Don't leave anything along the way .(  √  )

69、【 Judgment questions 】 After removal, the muck removal vehicles shall be loaded according to the regulations , The tarpaulin is tight , Don't leave anything along the way .(  √  )

70、【 Judgment questions 】 The binding place of steel wire rope and iron parts shall be padded with soft objects .(  √  )

71、【 Judgment questions 】 Remove and store flammable materials 、 Explosive or toxic 、 Large storage tanks with harmful media shall be removed by cutting with mechanical and cooling measures .(  √  )

72、【 Judgment questions 】 Remove the column , The reinforcement shall be chiseled along the bottom of the column , Use manual chain fall directional traction , Then use gas welding to cut the reinforcement on three sides of the column , Keep the reinforcement on the front of the traction direction .(  √  )

73、【 Judgment questions 】 The magnitude of the resultant force 、 The direction is represented by the diagonal of the parallelogram formed by these two forces as adjacent edges .(  √  )

74、【 Judgment questions 】 The outdoor unit of air conditioner can be directly installed outside the balcony board .(  ×  )

75、【 Judgment questions 】 After the doctor's examination, anyone suffering from anemia 、 High blood pressure 、 Cramps 、 Heart disease, severe arthritis and other diseases not suitable for high-altitude operation shall not participate in high-altitude operation .(  √  )

76、【 Judgment questions 】 Various operation platforms 、 The unloading platform frame shall be kept stable , Do not connect with the construction scaffold . Overloading is strictly prohibited on the operation platform .(  √  )

77、【 Judgment questions 】 Construction drawing is an important basis for building construction , It is also an important technical document for enterprise management .(  √  )

78、【 Judgment questions 】 Use safe voltage in places where electric shock is easy .(  √  )

79、【 Judgment questions 】 The concrete foundation shall not be operated on the concrete during the curing period .(  √  )

80、【 Judgment questions 】 The construction methods of integral assembled tower and disassembled assembled tower are the same , The safety regulations for integral erection of poles and towers shall be followed .(  ×  )

81、【 Judgment questions 】 Carry out electric welding in humid and other harsh environment , Must stand on a dry wooden board or wear rubber insulated shoes .(  √  )

82、【 Judgment questions 】 When working at heights , The horse gallows on the wall are the fittings installed on the roof daughter wall . The part of the building where the horse mounted on the wall is installed must be strictly tested to see if it is sufficient to bear the relevant ( Pressure resistance 、 Bending resistance ) load .(  √  )

83、【 Judgment questions 】 The folding head of webbing shall be connected with thread seam , Rivets can be used 、 Adhesive 、 Heat sealing and other processes .(  ×  )

84、【 Judgment questions 】 Working under the overhead transmission line without power failure .(  ×  )

85、【 Judgment questions 】 Smoking is prohibited , Beware of falling objects and other environmental signs. The distance between the lower edge of the sign and the ground shall not be less than 3m.(  ×  )

86、【 Judgment questions 】 The inner wall of the wall also acts as a partition .(  √  )

87、【 Judgment questions 】 The working rope for working at heights is generally made of chemical fiber , Japanese nylon rope , Nylon rope .(  √  )

88、【 Judgment questions 】 The purpose of studying air conditioning is to find a job to install air conditioning and earn money .(  ×  )

89、【 Judgment questions 】 Seat plate single spreader 、 camisole 、 Lining belt 、 When the belt is partially damaged , Not affecting use .(  ×  )

90、【 Judgment questions 】 The demolished objects shall be managed by special personnel , Spray water and clean regularly , Necessary watering facilities shall be provided 、 Drainage facilities .(  √  )

91、【 Judgment questions 】 Hand held power tools , Before each use , Check whether the insulation is intact , Whether the switch is sensitive and reliable .(  √  )

92、【 Judgment questions 】 When drilling with water , At the beginning of the moment , Operators are most likely to lose balance .(  √  )

93、【 Judgment questions 】 Sometimes, in order to make up for the deficiency of scaffolding, platforms are set up on the construction site , For personnel to work or stack materials 、 Use of large tools .(  √  )

94、【 Judgment questions 】 During static crushing agent operation , After injecting crushing agent into the hole , Operators shall keep a safe distance , It is strictly prohibited to walk or stay in the injection hole area .(  √  )

95、【 Judgment questions 】 Safety shoes are oil resistant 、 wear-resisting 、 Acid and alkali resistance 、 insulation 、 waterproof 、 Lightweight and other characteristics .(  √  )

96、【 Judgment questions 】 The employer must take effective occupational disease prevention measures , And provide workers with occupational disease protection articles for personal use .(  √  )

97、【 Judgment questions 】 Work at heights , The equipment management department shall assign special personnel to supervise .(  √  )

98、【 Judgment questions 】 Safety protection articles , Also known as labor protection products , It refers to the ability to protect the personnel during construction , Supplies to protect operators from or reduce various personal injuries or occupational hazards .(  √  )

99、【 Judgment questions 】 The dangerous and harmful factors of work at heights are closely related to the working environment .(  √  )

100、【 Judgment questions 】 The low point of the pipe turning over of the heating and air conditioning water system shall be equipped with a drainage device , For the hot water heating system, the highest point shall also be equipped with automatic ventilation device .(  √  )

Support accurate high-altitude installation in all regions of the country 、 maintain 、 Remove the homework test questions , Support safety certificate , Special operation certificate , Exercises on the question bank of vocational skill appraisal and other types of work .